Laserfiche WebLink
ameO <br /> L • The Site characterization and well installation activities will be Y completed b April 2 <br /> P <br /> 2010. <br /> L • The air sparge pilot test will be completed by April 9, 2010. <br /> • The draft AS pilot test report will be submitted to Caltrans for review by May <br /> L 21, 2010. <br /> 7.0 REFERENCES <br /> Geocon Consultants Inc. (Geocon), 2009a, Site Conceptual Model, Stockton Yard <br /> Maintenance Station, 1604 B Street, Stockton, California, January 28. <br /> Geocon, 2009b, Groundwater Monitoring Report, Second Quarter 2009, Stockton Yard <br /> Maintenance Station, 1604 B Street, Stockton, California, June 15. <br /> Geocon, 2009c, Groundwater Monitoring Well Installation Report, Stockton Yard Maintenance <br /> Station, 1604 B Street, Stockton, California, August 10. <br /> IT Corporation (IT) 2002, Remedial Action Plan, Shop 10 Maintenance Station, 1603 South B ' <br /> Street, Stockton, California, March 19. <br /> Wagner et al. 1991. Geologic Map of the San Francisco - San Jose Quadrangle, California; <br /> Weir, Walter Wallace. 1952. Soils of San Joaquin County, California <br /> iL AMEC Geomatrix, Inc. <br /> P:\Project\14000s\14443_Caltrans\TO 10\11000_PIANSWS WP—March 2010AS WP.doc 15 <br /> L <br />