My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000243
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1604
>
3500 - Local Oversight Program
>
PR0543431
>
ARCHIVED REPORTS XR0000243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 2:26:56 PM
Creation date
2/5/2019 1:07:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000243
RECORD_ID
PR0543431
PE
3528
FACILITY_ID
FA0003683
FACILITY_NAME
Caltrans-Stockton
STREET_NUMBER
1604
Direction
S
STREET_NAME
B
STREET_TYPE
St
City
Stockton
Zip
95206
APN
171-090-08
CURRENT_STATUS
02
SITE_LOCATION
1604 S B St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 3 2 GROUNDWATER SAMPLING <br /> On March 16, 1998, groundwater samples were collected from monitoring wells MW-1 <br /> through MW-12, VW-1 , and VW-2 Prior to the collection of groundwater samples, the <br /> monitoring wells were purged of a minimum of three well volumes of water and until pH, <br /> conductivity, and temperature stabilized The wells were allowed to recover to at least 80 <br /> percent of their original static groundwater levels prior to sampling <br /> The following are procedures for well monitoring, well purging, and water sampling <br />' 1 All equipment was washed prior to entenng the well with an Alconox solution, <br /> followed by two tap water rinses and a deiornzed water rinse <br /> 1 2 Prior to purging the wells, depth-to-water was measured using an Solinst <br /> groundwater interface probe to an accuracy of approximately 0 01 foot The <br />' measurements were made to the top of the well casing on the north side <br /> 3 Monitoring wells at the site were prepared for sampling by purging the well of <br />' approximately 3 well volumes of water using a polyvinyl chloride (PVC) bailer <br /> 4 Water samples were collected with a single-use Teflon bailer after the well had <br /> Mbeen purged and water in the well had equilibrated to approximately 80 percent of <br /> the static water level or 2 hours after well purging, whichever occurred first The <br /> water collected was immediately decanted into laboratory-supplied vials and <br />' bottles The containers were overfilled, capped, labeled, and placed in a chilled <br /> cooler prior to delivery to the laboratory for analysis <br />' 5 Chain-of-custody procedures, including chain-of-custody forms, were used to <br /> document water sample handling and transport from collection to delivery to the <br /> laboratory for analyses <br /> 6 Groundwater samples were delivered to the State-certified hazardous waste <br /> laboratory within approximately 48-hours of collection <br /> 7 Purged water was contained in a DOT approved 55-gallon drum The drum was <br />' labeled with the contents, date, well number, client name, and project number <br /> The groundwater monitoring purge logs are presented in Appendix A <br /> 2 <br /> F TraASf8rlproject\CaltyO9T8GOlMSTOCK-rON4gm 198FIN <br />
The URL can be used to link to this page
Your browser does not support the video tag.