My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BACON ISLAND
>
14200
>
3000 – Underground Injection Control Program
>
PR0524157
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:41:02 PM
Creation date
2/5/2019 3:23:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
WORK PLANS
RECORD_ID
PR0524157
PE
3030
FACILITY_ID
FA0016229
FACILITY_NAME
BARSOOM PROPERTY UIC
STREET_NUMBER
14200
STREET_NAME
BACON ISLAND
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
12920012
CURRENT_STATUS
02
SITE_LOCATION
14200 BACON ISLAND RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 March 2004 <br /> AGE-NC Proposal No. 04-2657 f <br /> Page 2'of 3 i1 <br /> • Total recoverable petroleum hydrocarbons(TRPII)iri accordance with EPA Method 418.1, <br /> carbon chain C-8 through C-44; w <br /> • Full scan 8260b, reporting all peaks; and <br /> j <br /> pH in accordance with EPA Method 150.1. , ` <br /> 2.0. COS <br /> The estimated cost for the above.services will be 5535.00. All icosts quoted are based on the scoae <br /> of work as discussed above and on our Standard Schedule of Charges; all costs will be billed to the <br /> Client at the time of sampling. Under no circumstances will additional work be performed without � <br /> prior authorization to proceed from the Client. This proAsal shall be consummated upon <br /> i <br /> authorization;full payment is required at time ofsampling. L k <br /> fi <br /> . 1 <br /> 3.0. EXCLUSIONS <br /> The followingitems are not included in this proposal: 1 Treatment or disposal of an waste <br /> p P ) p Y � <br /> material; 2) Advancement of soil borings; 3) Additional sampling and/or analysis if required by a <br /> Regulatory Agency; 4) Regulatory oversight fees, if applicable; 5) Preparation of a technical or. <br /> closure report;6) Other costs not specifically stated in this proposal. <br /> 4.0. ASSUMPTIONS <br /> This,proposal assumes the'following: 1) Access to the site will be secured by the Client; 2) All <br /> activities at the site can be performed during normal working hours; 3) All costs incurred due to <br /> r regulatory directives, after this proposal; shall be assumed by the Client. <br /> 5.0. SCHEDULE <br /> The work outlined in this proposal will be initiatedupon receipt of authorization to proceed and <br /> payment in full from the Client at the site before sampling.AGE and an SJC EHD representative are <br /> scheduled to perform scope of work on 02 April 2004 at 1300'1 t <br /> !1 <br /> �i Advanced GeoEnvkonmental,Inc. <br /> jI <br />
The URL can be used to link to this page
Your browser does not support the video tag.