My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2900 - Site Mitigation Program
>
PR0526345
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:57:12 PM
Creation date
2/5/2019 3:45:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526345
PE
2957
FACILITY_ID
FA0017827
FACILITY_NAME
FLAG CITY SHELL
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 0 <br /> DTSC VAPOR SAMPLING PROCEDURE <br /> Assuming location is clear of utilities, advance vapor sampler (GeoProbe, Post a�� <br /> Run Tubing sampler) to specified depth. <br /> Retract sampler four-inches and advance ''/.tubing with connector attached down <br /> the center of the rod. <br /> Cut tubing a foot long, attach two-way stop valve (valve closed). Reverse screw <br /> the tubing until tight. <br /> Give a light tug to assure connector is seated. <br /> Apply previously hydrated bentonite to rod at ground level to seal and let stand <br /> 20 minutes. <br /> Install flow controllers to sample canister and purge canister. <br /> Install "T"fitting and two-way shut-off valves, connect with tubing. Check to <br /> assure shut-off valve closest to rod is closed, open all other two-way valves. <br /> Open purge canister briefly and close. This will pressurize the Niue. Take nale of <br /> the pressure gauge, pressure should hold. Continue for 10 n*%tBs. IfpresWe <br /> drops, tighten frttings and try again. Repeat until pressure holds for 10 rte. <br /> Once leak test is complete and 20 minutes has elapsed (far berdw*e seaq, <br /> close valve to sample canister and open down hole valve. <br /> Open purge canister, purge one to three volumes of tubing. When purge is <br /> complete, close canister and purge shut-off valve. Open valve for sampler <br /> canister and two-way valve. <br /> NOTE BEGINNING READING ON GAUGE (flow controller): it should be <br /> between 30" and 25"of mercury. <br /> Begin swabbing fittings with cotton swabs (or paper towel) dabbed with Pt% <br /> isopropyl alcohol <br /> Continue every five minutes until mercury level drops to ftve-jt ,• 'rrna <br /> we <br /> vary upon flow controller settings (norm* 30 or 60 minutes)and may als4be <br /> affected by the lithology, clays, sands, etc. <br /> EGG <br /> TO 30Vd 9NIIII2IG 993J9 ZOE0STESZ6 ZE:LO LOOZ/ET/60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.