My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2900 - Site Mitigation Program
>
PR0526345
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:55:29 PM
Creation date
2/5/2019 3:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526345
PE
2957
FACILITY_ID
FA0017827
FACILITY_NAME
FLAG CITY SHELL
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • - <br /> Workplan for Monitoring Well Installation <br /> Flag City New West#1003,6437 West Banner Street,Lodi,California <br /> Page 2 <br /> The Flag City Chevron located south of the site at 6421 Capitol Avenue had a groundwater <br /> pumping-and-treatment system to remediate the dissolved phase petroleum in groundwater at the <br /> site. The groundwater pumping and treatment system removed les than 14 pounds of dissolved <br /> phase MTBE from groundwater over an approximate five year period. The system is currently <br /> not operating. <br /> July 15, 2005 —Apex submitted a workplan titled, Workplan for Preliminary Site Assessment, <br /> proposing the installation of eight-soil borings. <br /> July 15, 2005 —The SJCEH issued a letter to New West requiring a workplan addendum to <br /> define the lateral and vertical extent of the petroleum plume coming from the site utilizing <br /> monitoring wells. <br /> July 22, 2005 —Apex submitted a workplan titled, Workplan for Preliminary Site Assessment <br /> (Monitoring Wells)Addendum, proposing four first zone wells and two second zone wells on and <br /> off site. The SJCEH accepted the workplan in a letter dated July 27, 2005. <br /> August 1, 3, and 11, 2005 -Apex personnel supervised the installation of six groundwater <br /> monitoring wells(MW-1, MW-2, MW-3A,MW-3B, MW-4A and MW-4B). MTBE was <br /> detected in soil at wells MW-3A and MW-3B and MTBE was detected in groundwater at wells <br /> MW-1, MW-3A,MW-3B and MW-4B. Results are documented in the report Groundwater <br /> Monitoring Well Installations Results Report, dated September 22, 2005. <br /> September 16, 2005 —The SJCEH issued a letter requesting additional monitoring wells to define <br /> the lateral and vertical of the groundwater plume and the installation of an interim remediation <br /> system (Appendix A). <br /> October 2005 -Apex commenced sampling the two municipal drinking water wells located along <br /> De Broggi Road on a monthly basis. <br /> October 17, 2005 -Apex submitted Workplan for Monitoring Well Installations and <br /> Interim Remedial Action, proposing extraction and monitoring well installations and a <br /> remediation system proposal. The workplan was approved by the SJCEHD in a letter dated <br /> October 18, 2005. <br /> On October 27-28 and November 30, 2005, Apex personnel supervised the drilling, sampling and <br /> installation of five extraction wells (EW-1, EW-2, EW-3, EW-4, and EW-5). <br /> On November 9 through 11, 2005, Apex personnel supervised drilling, sampling and the <br /> installation of four offsite groundwater monitoring wells (MW-5A, MW-5B, MW-6B, and MW- <br /> 6C) (Figure 2). <br />
The URL can be used to link to this page
Your browser does not support the video tag.