Workplan for Monitoring Well Installation <br /> Flag City New West#1003,6437 West Banner Street,Lodi,California <br /> Page 3 <br /> November 9, 2005-Apex,New West, SJCEH, and the CVRWQCB had a meeting discussing the <br /> site and future work. <br /> January 9, 2006-The SJCEHD issued a letter requiring clarity as to the owner and operator of the <br /> site for the clean up fund, stating additional sampling was needed for the NPDES permit, <br /> requiring Apex to conduct a pumping test, and to evaluate other remedial alternatives. <br /> January 2006 -To determine the source of the release at the site,New West performed an <br /> enhanced tracer test at the site. No deficiencies with the underground fueling system were <br /> detected during the enhanced tracer test. No source of a release at the New West site has been <br /> determined. <br /> March 30, 2006 -Apex,New West, SJCEH, and the CVRWQCB had a meeting discussing the <br /> site and future work. It was decided that additional wells and interim remediation is needed at <br /> the site. <br /> March 30, 2006—Apex prepared and submitted an Interim Remediation Plan Letter including a <br /> proposal to submit a workplan for additional wells at the site. <br /> April 4, 2006—Interim remediation was initiated using weekly 4,800 gallon batch extraction <br /> events from well EW-4 as approved by SJCEHD (Appendix A). <br /> MONITORING WELL INSTALLATIONS <br /> Based on current soil and groundwater conditions (Tables 1 through 3) and as illustrated on <br /> Figures 3 through 7, Apex proposes to install seven additional monitoring wells as shown on <br /> Figure 8 (MW-3C,MW-7A, MW-7B,MW-8A, MW-8B, MW-9B, and MW-9C). The <br /> placement of these new wells will provide lateral and vertical definition information and provide <br /> additional information regarding the nature and number of sources in the vicinity and assess the <br /> possibility of commingled plumes. Offsite wells will be installed on private properties and right- <br /> of-entry agreements will have to be contracted prior to well installation. Depth to groundwater is <br /> approximately 14 feet below ground surface(bgs) and all wells will be installed using a hollow <br /> stem auger drill rig. All wells will be constructed using Schedule 40 PVC and 0.020 slotted <br /> schedule 40 PVC screen. A zone wells will be installed within the first zone to a total depth of <br /> 25-feet bgs and screened from 5-to 25-feet bgs. B zone wells will be installed in the second <br /> zone to a total depth of 50-feet bgs and screened from 40 to 50 feet bgs. C zone wells will be <br /> installed in the Rocky's upper zone to a total depth of 75-feet bgs and screened from 70-to 75- <br /> feet bgs. Total depth may be modified pending subsurface conditions. The annular space <br /> between the well screen/casing and the borehole will be backfilled with a#3 Monterey sand pack <br /> from total depth to 1-foot above the screened interval, followed by 2-feet of hydrated bentonite <br /> and Portland cement to the surface. The well casings will be protected with locking expansion <br /> caps and traffic-rated vault boxes. <br />