My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2900 - Site Mitigation Program
>
PR0526345
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:55:29 PM
Creation date
2/5/2019 3:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526345
PE
2957
FACILITY_ID
FA0017827
FACILITY_NAME
FLAG CITY SHELL
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
caused when the well was installed. <br /> There is considerable amount of <br /> additional parking apart from the well. <br /> Trend analysis shows MTBE will not be Trend analysis is based on data collected <br /> detected in MW-20A water samples by during GWE, and may not be applicable <br /> February2011, to natural conditions,without GWE. <br /> Nearby extraction well EW-10A was ND for The wells had two pairs of <br /> MTBE when it was last sampled; therefore contemporaneous sampling results as <br /> MW-20A is probably ND, shown below. Concentrations are in <br /> micrograms per liter: <br /> EW-10A I MW-20A <br /> 11/19/2009 <1(ND) 150 <br /> 12/28/2010 <1 22 <br /> Extraction well EW-10A is approximately <br /> 82 feet obliquely down gradient of <br /> monitoring well MW-20A,and the table <br /> above shows that there is no correlation <br /> between an "ND" in EW-10A and the <br /> contemporaneous contaminant <br /> concentration in MW-20A. <br /> MW-20B Groundwater monitored by the well is ND <br /> for MTBE,this deeper screened well <br /> passes through the contaminated water <br /> monitored by MW-20A; therefore,the <br /> evaluation of issues related to MW-20A <br /> apply to well MW-20B. <br /> Interval through impacted zone has a grout The Nebraska Well Grout Study found <br /> seal between casing and impacted portland cement grouts do not adhere to <br /> groundwater. PVC plastic and a micro-annulus develops <br /> between the cement grout and the well <br /> casing, creating a vertical migration <br /> pathway for groundwater and any <br /> contaminants in the groundwater. <br /> Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.