Laserfiche WebLink
Workplan for Preliminary Site Assessment(Monitoring Wells) Addendum <br /> Flag City New West Station#1003,6437 W Banner Avenue,Lodi,California <br /> Page 4 <br /> . ANALYTICAL PROCEDURES <br /> All soil and groundwater samples will be submitted for analysis of <br /> Analysis Abbreviation Designation USEPA Method No <br /> Total Petroleum Hydrocarbons <br /> as Gasoline TPHg Gas/Diesel <br /> Range 8015M <br /> Total Petroleum Hydrocarbons <br /> TPHd Hydrocarbons <br /> as Diesel <br /> Benzene <br /> Toluene Aromatic <br /> Ethylbenzene BTEX Volatile 8021 _ <br /> Organics <br /> Xylenes Total <br /> Tertiary Butyl Alcohol TBA <br /> Methyl Tertiary Butyl Ether MTBE <br /> Di-isopropyl Ether DIPS 82608 <br /> Ethyl Tertiary Butyl Ether ETRE Seven Fuel <br /> Oxygenates <br /> Tertiary Amyl Methyl Ether TAME <br /> Ethanol <br /> 8015M <br /> Methanol <br /> • A 4 1 composite sample will also be collected for disposal purposes and analyzed for the above <br /> constituents In addition, total lead by EPA Method 6010 will be analyzed for the composite <br /> sample <br /> PERMITTING <br /> Prior to drilling, permits will be obtained from the SJCEHD and an offsite right-of-entry <br /> agreement will be required prior to the installation of offsite wells MW-4A and MW-4B <br /> Underground Service Alert will be contacted at a minimum of 48-hours prior to drilling activities <br /> for identification of buried utilities at or entering the project site from the public right-of-way <br /> SITE SPECIFIC HEALTH AND SAFETY PLAN <br /> A site specific Health and Safety Plan (HASP) will be prepared and will be retained on site <br /> during all field activities All work will be conducted according to the HASP The HASP will <br /> contain information on the properties of the hazardous materials known to be on the site This <br /> information is equivalent to that contained within Material Safety Data Sheets <br /> SCHEDULE <br /> Upon approval of this workplan, drilling permits and right-of-entry agreements will be obtained <br /> and well installation will be completed within four weeks A results report will be prepared and <br /> • submitted within six weeks of the completed well and soil bonng installations <br />