My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26501
>
2900 - Site Mitigation Program
>
PR0505092
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 4:57:53 PM
Creation date
2/5/2019 4:48:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505092
PE
2960
FACILITY_ID
FA0006532
FACILITY_NAME
LYOTH LOADING STATION/CHEVRON
STREET_NUMBER
26501
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
26501 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Page 4 of 9 <br /> 10 <br /> not be doing anything associated with this work plan during the upcoming Lyoth Offsite <br /> mobilization. <br /> As far as updating the drawings/figures, we don't usually assign numbers/IDs to our <br /> proposed borings on our work plan maps. <br /> Let me know if we can make the schedule next week and if you have any questions. <br /> Hope this clears things up. <br /> Thanks, <br /> William Slowik <br /> Project Geoscientist <br /> SAIC <br /> phone: (559) 638-7655 <br /> cell: (916) 416-3075 <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Wednesday, January 03, 2007 3:59 PM <br /> To: Slowik, William P <br /> Subject: RE: Chevron EMC's Lyoth Site <br /> No, they are not processed yet. I was waiting to hear from you. <br /> I'm still NOT clear on where (what parcel, what borings)you plan on starting with Jan 8 & <br /> 9. <br /> 1 have two work plans in front of me. One dated March 23, and the other March 29, <br /> 2006. WHICH one are you working on first?Which figure (#2 or#5) are we going to work <br /> on first? <br /> Please update any drawings/figures from these work plans to correctly locate each boring <br /> on a parcel that can be identified. <br /> From: Slowik, William P [mailto:WILLIAM.P.SLOWIK@saic.com] <br /> Sent: Wednesday, January 03, 2007 9:39 AM <br /> To: Mike Infurna [EH] <br /> Cc: Anzelon, Daniel B. <br /> Subject: Chevron EMC's Lyoth Site <br /> Hi Mike, <br /> Happy New Year! I'm checking to see if the Lyoth permits from December have <br /> been processed (see below email chain for refresher). I was going to call my <br /> driller and see if they are available next Monday and Tuesday(January 8th and <br /> 9th). Would you be available for inspections on those days? Scope of work is <br /> three to four direct push soil borings to 25 feet bgs with large volume grab <br /> groundwater sampling. <br /> Thanks, <br /> William Slowik <br /> Project Geoscientist <br /> SAIC <br /> phone: (559) 638-7655 <br /> 1/4/2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.