Laserfiche WebLink
0 Page 9 of 9 <br /> Additionally, the permit application for the UPRR was NOT <br /> signed. Please open the attachment and print and sign the <br /> APPLICATION at the area noted by the big STAR in the left <br /> margin. <br /> Also attached is one of the two LCDs sent in. Neither has your <br /> name on it and I enclosed one to show you (at the bottom of the <br /> page noted by the arrow in the left margin).You can add your <br /> name or I can.You tell me it's ok with the driller(C-57)for me to <br /> add your name he's signing for and I'll do it. Then you only have <br /> to get the signed permit application back to me. <br /> Our Site Mitigation fee has increased July 1, 2006 to $285. <br /> Typically this is NOT needed if there has NOT been a change in <br /> the billing party ALREADY assigned to this site. If Chevron Env <br /> Mgmt(CEM) is NOT the billing party, then this fee is needed <br /> along with a new MFR to identify the new billing party. IF CEM is <br /> still the correct billing party, the $279 you included in the check <br /> may be needed for additional permit fees if you need them. <br /> Once I have a clear understanding of WHERE the borings are <br /> planned, I can calculate your fees. Any excess can be applied to <br /> CEMs account that will be needed for my inspection charges for <br /> grout inspections. <br /> You can call me at (209)468-3454 if you need to talk about this. <br /> 1/4/2007 <br />