Laserfiche WebLink
Inspection Report: All Pure Chemical Page 2 <br /> Constituent Pond-1 Pond-2 Pond-3 Pond-4 Pond-5 Pond-6 <br /> Q/1 W-91/- 1 �c l_ll (L C,J (u 111 <br /> Carbon Tetrachloride 196 7.6 <1.2 <3.0 <0.6 <0.6 <br /> Chloroform 113 22.7 trace 21.2 9.3 0.3 <br /> B romo dichlorom ethane 13.9 5.6 <1.2 24.3 0.8 <0.1 <br /> D ib romochlorom ethane 3.4 trace <1.2 53.3 trace <0.1 <br /> Bromoform <3.0 <3.0 <1.2 75.3 <0.6 <0.1 <br /> Naphthalene 3.6 <3.0 <1.2 <3.0 <0.6 <0.1 <br /> The two stormwater samples collected outside All Pure's fenced area contained chloroform and other <br /> trihalomethanes. Although the March results confirm that trihalomethanes are not present in the two supply <br /> wells, the March samples did contain very low levels of iso-propylbenzene and toluene. <br /> Constituent StormwaterSW StormwaterS Eastwell Westwell <br /> �� 1 �L� 1 <br /> Carbon Tetrachloride <1.2 <3.0 <0.1 <0.1 <br /> Chloroform 223 267 <0.1 <0.1 <br /> Bromodichloromethane 3.8 38.3 <0:1 <0.1 <br /> Dibromochloromethane 8.5 7.6 <0.1 <0.1 <br /> Bromoform <1.2 <3.0 <0.1 <0.1 <br /> Iso-propylbenzene <1.2 <3.0 0.2 0.1 <br /> Toluene <1.2 <3.0 0.1 trace <br /> Mr. Vickers informed me that the facility's new wastewater recycling system had started up in the afternoon <br /> of 19 March 1996, and was going through a test run at the time of inspection. <br /> Summary and Conclusion <br /> The March 1996 analytical results from the wastewater ponds at the All Pure facility confirm that water in <br /> Ponds 1 and 2 contains carbon tetrachloride, chloroform, and other VOCs, and water in Pond 4 contains <br /> chloroform and other VOCs. <br /> The chloroform and other trihalomethanes detected in the stormwater samples indicate that water from the <br /> ponds has overflowed to the surrounding area. <br /> Although the low levels of VOCs detected in Pond 3 in January 1996 were not confirmed, a trace of <br /> chloroform was found in this pond in the March results. Low levels of trihalomethanes, including <br /> chloroform, were detected in Pond 5, which receives wastewater containing water softener. <br /> The March 1996 analytical results also confirm the lack of carbon tetrachloride, chloroform, and other <br /> trihalomethanes in All Pure's two supply wells, although very low levels of iso-propylbenzene and toluene <br /> were detected in both wells in March. <br /> PAL:pal/lsb <br />