Mr. Verrill Norwood -4- 6 August 1996 <br /> SCHEDULE <br /> A detailed schedule proposing estimated dates for the following activities must be provided. <br /> • Start of full scale operation of the wastewater reclamation system <br /> • Installation of the aboveground tanks for storage of water for fire protection <br /> • Cease use of each pond <br /> • Complete emptying of each pond/photographing empty ponds, before removal of liners <br /> or soils <br /> • Removal of pond liners/soil sampling <br /> • Report on results of soil sampling with proposal for removal/remediation of soils, <br /> backfilling, grading, and closure schedule <br /> • Closure of ponds <br /> • Closure report <br /> Please address the above comments no later than 30 August 1996. If you have any questions, <br /> you may call me at (916) 255-3048. <br /> U <br /> POLLY LOWRY <br /> PAL:pal/lsb <br /> Attachment <br /> cc: San Joaquin County Public Health Services, Stockton <br /> Mr. Tim Vickers, All Pure Chemical Company, Tracy <br />