My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 5:14:52 PM
Creation date
2/5/2019 4:58:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506297
PE
2960
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
01
SITE_LOCATION
26700 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wendy L. Cohen -6- 22 January 1996 <br /> TDD will soon be installing an infiltration gallery and a ground water extraction and treatment system <br /> north of All Pure in the area where domestic wells are contaminated with chloroform and carbon <br /> tetrachloride. TDD is concerned that the remediation system will result in further migration of the <br /> chloroform and carbon tetrachloride from All Pure to the north towards the extraction system, <br /> increasing the treatment system costs. <br /> All Pure should be required to complete the ground water investigation at its facility. Source areas of <br /> each VOC, the lateral and vertical extent of ground water contamination, and ground water flow <br /> directions with and without the production wells pumping need to be determined so that a remediation <br /> systern can be installed for removing contaminants at the source areas and for containing the plume and <br /> preventing migration of the plume towards the TDD extraction system. As part of this investigation, it <br /> will be necessary to obtain as much information as possible about the two All Pure production wells. <br /> Construction details and the pumping history of each well are necessary to determine the effects of these <br /> two wells on ground water flow patterns at the site. These two wells should also be sampled for VOCs <br /> again. <br /> A system to recycle wastewater at All Pure is expected to be operational by the end of January 1996. <br /> All Pure should be required to submit a closure plan for the wastewater ponds. <br /> PAL:paUlsb <br />
The URL can be used to link to this page
Your browser does not support the video tag.