My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 2:38:55 PM
Creation date
2/5/2019 5:04:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506297
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
26700 S BANTA RD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f =MAR 12' '92 14:40 0 C 1 16:3715821 - P.4 <br /> TASK 2.0 - SOIL, BORING AND SAMPLING <br /> If Task 1.0 is successfully completed, 12 additional soil borings will be constructed at <br /> locations specified by All Pure Chemical Company. Each soil boring will be advanced to a <br /> depth approximately three feet below the encountered groundwater surface. <br /> Soil samples, for the purpose of describing soil penetrated, will be periodically <br /> collected. A single soil sample from each boring will be collected from unsaturated soil <br /> immediately above the groundwater surface encountered at the time of drilling. This soil <br /> sample will be collected within brass tubes using a soil coring device. The ends of each <br /> filled brass tube will be sealed using Teflon sheeting secured by plastic cap and tape. <br /> A groundwater sample will be collected from each soil boring. All development and <br /> groundwater sampling will be collected using baiting methodologies. In accordance with the <br /> All Pure Chemical Company work plan, all groundwater samples will be collected from <br /> uncased boring holes. Attempts will be made to develop the uncased boreholes to minimize <br /> sampled water turbidity. Prior to sampling, uncased boreholes will be purged. However, it <br /> must be recognized that the uncased nature of the boreholes may result in the collection of <br /> turbid water sample. Excessive water turbidity may adversely affect the accuracy of <br /> subsequent laboratory analyses. All groundwater samples will be handled in accordance with <br /> United State Environmental Protection Agency accepted protocol. <br /> TASK 3.0 - ABANDON SOIL BORINGS <br /> In order to comply with County requirements, we anticipate that all soil borings <br /> constructed will have to be abandoned by backfilling with cement grout within 24 hours of <br /> their construction. We also anticipate that a representative of the County will request to be <br /> present to witness the soil boring abandonment activities. We have assumed that no <br /> additional costs will be incurred for the County's inspection of soil boring abandonment <br /> activities. <br /> Each soil boring will be abandoned by backfilling soil borings with a cement ba- <br /> grout mixture. Grout will be placed using tremie line methods and gravity displaceme4 <br /> methods. <br /> TASK 4.0 M LABORATORY ANALYSES <br /> In accordance with instruction received from All Pure Chemical Company, each of the <br /> 13 soul and 13 groundwater samples will be submitted to a laboratory and analyzed by the <br /> following methods. <br /> Method 8015M for Total Petroleum Hydrocarbons <br /> Method 5521 for Waste Oil and Heavy Hydrocarbons <br /> Aarh .oz� 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.