Laserfiche WebLink
• Data evaluation and discussion, including <br /> - Data validation, <br /> - Tabulated summary of the analytical data, <br /> - Site location map and site plan, <br /> - Figures summarizing the groundwater analytical data; <br /> • Conclusions and recommendations; and <br /> • Appendices containing <br /> Permits, <br /> CPT logs, <br /> Laboratory analytical reports and chain-of-custody forms. <br /> 4.0 Schedule <br /> It is anticipated that the field work can be completed within approximately 4 weeks after receiving <br /> offsite access. Laboratory analytical data should be received approximately three weeks following <br /> completion of the field work. A final copy of the site investigation report is expected to be submitted <br /> to RWQCB approximately 6 weeks after receipt of final copies of the laboratory analytical data <br /> reports. <br /> 5.0 References <br /> Montgomery Watson, 1995a. DDRW-Tracy Draft Comprehensive RI/FS. Phase II Technical <br /> Memorandum. March. <br /> Montgomery Watson, 1995b. DDRW-Tracy Preliminary Design Data Report. February. <br /> Montgomery Watson, 1998a. DDJC-Tracy, Site Wide Comprehensive Record of Decision. 31 <br /> March 1998. <br /> Montgomery Watson, 1998b. DDJC-Tracy Well Monitoring Program, Draft 1998 Annual <br /> Monitoring Report. December 1998. <br /> Radian International (Radian), 1998. Site-Wide Comprehensive Record of Decision for DDJC- <br /> Tracy. April 1998. <br /> Central Valley Regional Water Quality Control Board(RWQCB), 1995. Tracy Well Survey Report, <br /> San Joaquin County. 28 December, 1995. <br /> Work Plan <br /> IT Corporation <br /> 6 All Pure,Tracy <br />