Laserfiche WebLink
wood. <br /> 9.0 REPORTING <br /> A report documenting the well decommissioning and installation activities will be provided to <br /> the CVWB following completion of the work. Sampling results from the new groundwater <br /> monitoring well, MW-17, will be reported biennially in the Biennial Monitoring and Sampling <br /> Reports. <br /> 10.0 SCHEDULE <br /> Decommissioning and installation activities described above are contingent upon Water Board <br /> approval of this Work Plan and obtaining access from Union Pacific Rail Road to conduct work <br /> within the railroad right-of-way. Work is anticipated to begin within 45 days following receipt <br /> of both Water Board approval and Union Pacific Rail Road access. <br /> 11.0 REFERENCES <br /> Amec Foster Wheeler Environment & Infrastructure, Inc., 2017. 2017 Conceptual Site Model <br /> Report, Olin Chlor Alkali Facility—Tracy, California. August 31. <br /> Central Valley Regional Water Quality Control Board (CVWB), 2018. Re: Central Valley Regional <br /> Water Quality Control Board Revised Monitoring and Reporting Program: Olin Chlor <br /> Alkali Facility, 26700 South Banta Road, Tracy, San Joaquin County, California (Global ID <br /> SI-185422914); Cost Recover ID No. 1854200. July 30. <br /> CVWB, 2021. Central Valley Regional Water Quality Control Board Response to: Response to <br /> Comments 2021 and 2019 Biennial Monitoring and Sampling report, Olin Chlor Alkali <br /> Facility, Tracy, San Joaquin County, California. September 23. <br /> Department of Water Resources, 1991. California Well Standards, Bulletin 74-90.June. <br /> Environmental Health Department. 2005. San Joaquin County Well Standards. February <br /> Wood Environment & Infrastructure Solutions, Inc., 2021. Proposed Revisions to Monitoring <br /> and Reporting Program R5-2012-0813, Olin Chlor Alkali Facility, 26700 South Banta <br /> Road, Tracy, California. December 17. <br /> https://woodpIc.sharepoint.com/teams/OlinTracy/Shared Documents/General/03.0 DocCtrl/2022 Decomm WP/Revised Decomm 5 <br /> WP/01_text/2022_07_Tracy_Wood_Decomm WP_text.docx <br />