My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 2:38:55 PM
Creation date
2/5/2019 5:04:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506297
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
26700 S BANTA RD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wood. <br /> APPENDIX A <br /> GROUNDWATER MONITORING WELL INSTALLATION METHODS <br /> Olin Chlor Alkali Facility <br /> 26700 South Banta Road, <br /> Tracy, California <br /> A.1.0 INTRODUCTION <br /> This attachment details the methodology for the proposed installation of a groundwater <br /> monitoring well presented in the "Well Decommissioning and Replacement Well Installation <br /> Work Plan" (referred to herein as the "Work Plan"). <br /> A.2.0 FIELD METHODOLOGY <br /> Prior to implementing fieldwork activities, Wood will update the health and safety plan (if <br /> needed), obtain permits, contact the Underground Service Alert one-call center, and contract a <br /> private utility locator. Wood will contract with a licensed C-57 driller contractor to perform <br /> drilling and well installation activities. <br /> A.2.1 GROUNDWATER MONITORING WELLS <br /> The procedures for installation, development, and sampling of monitoring wells are described <br /> in the following sections. <br /> A.2.1.1 Monitoring Well Installation <br /> The boring will be advanced using hollow-stem auger (HSA) drilling methods. <br /> The soil will be continuously cored at each boring location and drilling equipment will be <br /> decontaminated between borings. Lithologic information from the soil cores will be recorded <br /> on geologic logs using the Unified Soil Classification System, in accordance with visual-manual <br /> procedures of the ASTM International Standard D2488. Soil moisture and color will also be <br /> recorded on the geologic log. Soil logging activities will be performed by a field geologist <br /> under the supervision of a California-licensed Professional Geologist. <br /> The new monitoring well (MW-17) will be constructed in compliance with the appropriate state <br /> (Department of Water Resources, 1991) and local well permitting requirements. After <br /> https://woodpIc.sharepoint.com/teams/OlinTracy/Shared Documents/General/03.0 DocCtrl/2022 Decomm WP/Revised A-1 <br /> Decomm WP/04_Appendices/App A_methods.doa <br />
The URL can be used to link to this page
Your browser does not support the video tag.