wood. <br /> advancing the borehole to the targeted total depth (approximately 55 feet below ground <br /> surface), monitoring well MW-17 will be constructed within the augers using 2-inch-diameter <br /> Schedule 40 PVC blank casing and 10 feet of slotted (0.020 slots) screen. Centralizers will be <br /> placed along the casing every 20 feet to keep the casing in the center of the borehole. The <br /> annular space between the monitoring well screen and surrounding formation will be <br /> backfilled with Cemex brand #2/12 or#3 sized filter pack sand (or equivalent), which will be <br /> placed such that the top of the filter pack extends at least 1 foot above the screened interval. <br /> At least 2 feet of medium bentonite chips will then be placed above the filter pack sand and <br /> allowed to hydrate in place. The remaining annular space will be sealed using Portland cement <br /> mixed with 3-5% bentonite gel (cement-bentonite grout). Annular materials will be placed at <br /> depth within the augers to prevent bridging or borehole collapse. Monitoring well MW-17 will <br /> be completed with a traffic-rated, flush-mounted well box. A locking, watertight plug will be <br /> placed in the top of the monitoring well casing. Wood will contract a Professional Land <br /> Surveyor to survey the location of MW-17 following installation. <br /> A.2.1.2 Monitoring Well Development <br /> At least 48 hours after installation, the new monitoring well will be developed using a <br /> combination of bailing, surging, and purging until the water is relatively visibly clear and field <br /> parameters (temperature, pH, turbidity, and specific conductance) are relatively stable (i.e., <br /> parameter values change less than 10 percent between three sequential measurements). These <br /> parameters and total volume of water removed will be monitored during well development <br /> and recorded on a well development record. At least 10 well casing volumes of water will be <br /> removed from the well during development. If water was added in the outer casing during <br /> borehole advancement through the screen interval, an effort will be made to purge an <br /> equivalent volume of water from the well during well development to the extent practical. <br /> A.2.1.3 Groundwater Sampling <br /> Water level measurements will be collected in newly installed monitoring well MW-17 prior to <br /> groundwater sampling. The water levels will be measured with an electric sounder that is <br /> graduated to the nearest 0.01 ft. Following the measurement of depth to water, the wells will <br /> be purged. Monitoring well MW-17 will be sampled using standard low-flow purging and <br /> sampling techniques with a bladder pump at a rate of no more than 500 milliliters per minute, <br /> A-2 https://woodplc.sharepoint.com/teams/OlinTracy/Shared Documents/General/03.0 DocCtrl/2022 Decomm <br /> M/Revised Decomm M/04_Appendices/App A_methods.docx <br />