My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2026 2:38:55 PM
Creation date
2/5/2019 5:04:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506297
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
26700 S BANTA RD TRACY 95376
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wood. <br /> advancing the borehole to the targeted total depth (approximately 55 feet below ground <br /> surface), monitoring well MW-17 will be constructed within the augers using 2-inch-diameter <br /> Schedule 40 PVC blank casing and 10 feet of slotted (0.020 slots) screen. Centralizers will be <br /> placed along the casing every 20 feet to keep the casing in the center of the borehole. The <br /> annular space between the monitoring well screen and surrounding formation will be <br /> backfilled with Cemex brand #2/12 or#3 sized filter pack sand (or equivalent), which will be <br /> placed such that the top of the filter pack extends at least 1 foot above the screened interval. <br /> At least 2 feet of medium bentonite chips will then be placed above the filter pack sand and <br /> allowed to hydrate in place. The remaining annular space will be sealed using Portland cement <br /> mixed with 3-5% bentonite gel (cement-bentonite grout). Annular materials will be placed at <br /> depth within the augers to prevent bridging or borehole collapse. Monitoring well MW-17 will <br /> be completed with a traffic-rated, flush-mounted well box. A locking, watertight plug will be <br /> placed in the top of the monitoring well casing. Wood will contract a Professional Land <br /> Surveyor to survey the location of MW-17 following installation. <br /> A.2.1.2 Monitoring Well Development <br /> At least 48 hours after installation, the new monitoring well will be developed using a <br /> combination of bailing, surging, and purging until the water is relatively visibly clear and field <br /> parameters (temperature, pH, turbidity, and specific conductance) are relatively stable (i.e., <br /> parameter values change less than 10 percent between three sequential measurements). These <br /> parameters and total volume of water removed will be monitored during well development <br /> and recorded on a well development record. At least 10 well casing volumes of water will be <br /> removed from the well during development. If water was added in the outer casing during <br /> borehole advancement through the screen interval, an effort will be made to purge an <br /> equivalent volume of water from the well during well development to the extent practical. <br /> A.2.1.3 Groundwater Sampling <br /> Water level measurements will be collected in newly installed monitoring well MW-17 prior to <br /> groundwater sampling. The water levels will be measured with an electric sounder that is <br /> graduated to the nearest 0.01 ft. Following the measurement of depth to water, the wells will <br /> be purged. Monitoring well MW-17 will be sampled using standard low-flow purging and <br /> sampling techniques with a bladder pump at a rate of no more than 500 milliliters per minute, <br /> A-2 https://woodplc.sharepoint.com/teams/OlinTracy/Shared Documents/General/03.0 DocCtrl/2022 Decomm <br /> M/Revised Decomm M/04_Appendices/App A_methods.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.