My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000293
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
2900 - Site Mitigation Program
>
PR0522015
>
ARCHIVED REPORTS XR0000293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 10:06:53 AM
Creation date
2/6/2019 10:00:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000293
RECORD_ID
PR0522015
PE
2950
FACILITY_ID
FA0015207
FACILITY_NAME
SJC MOSQUITO & VECTOR CONTROL DIST
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905031
CURRENT_STATUS
01
SITE_LOCATION
200 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />�` wWCENS ..ESSa11EF5 CON5..iAN'S <br /> . capped for transportation except that a vent hole, approximately 114 inch in diameter will <br /> be left open. <br /> 7 The tank will be transported to an appropriate disposal facility where it will be properly <br /> decontaminated and recycled The tanks will be properly transported under manifest by <br /> a licensed hauler in accordance with Federal and State regulations. <br /> 6.3 UST EXCAVATION INSPECTION AND SAMPLING <br /> Excavation Inspection <br /> After the tank has been removed, an inspection of the excavation from outside the excavation <br /> will be completed by WESTON staff and EHD prior to the removal of remaining backfill <br /> material. Interior surfaces of the excavation (UST and piping excavations) will be visually <br /> I inspected for discoloration or staining. The results of the inspections will be documented <br /> Approximately 2 ft of native soil will be removed from beneath the UST for field screening with <br /> a FID and potential analysis. If field screening results indicate petroleum impacted soil at this <br /> depth, excavation will continue untAl field screening indicates less than 50 units on a FID <br /> Confirmation samples will be collected after over-excavation has been completed. <br /> am lin <br /> For planning purposes, the following sampling and analytical tasks represent the minimum level <br /> of effort planned for the project Additional sampling requirements, such as sidewall sampling, <br /> may be completed based on site conditions and requests by EHD <br /> Soil and groundwater sampling of the UST excavations, including the number and location of <br /> samples, and analytical parameters are listed below Theses requirements follow EHD <br /> regulations in conjunction with the RWQCB's, "Tri-Regional Board Staff Recommendations For <br /> Preliminary Evaluation And Investigation of Underground Tank Sites, August 1990." <br /> Ifan roundwater is encountered at time within the tank excavation, it will be sampled at the <br /> g Y <br /> i direction of EHD for the same analytical parameters as the soil samples from the excavation. <br /> i <br /> Unleaded Gasoline T k - 1,000Gallon <br /> One soil sample will be collected from the fill or pump end of the tank excavation and analyzed <br /> for the following analytical parameters <br /> L\PR0JECT5"NJ0QUA1M ACP 12 15 May 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.