My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000299
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
2900 - Site Mitigation Program
>
PR0522015
>
ARCHIVED REPORTS XR0000299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 10:03:29 AM
Creation date
2/6/2019 10:02:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000299
RECORD_ID
PR0522015
PE
2950
FACILITY_ID
FA0015207
FACILITY_NAME
SJC MOSQUITO & VECTOR CONTROL DIST
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905031
CURRENT_STATUS
01
SITE_LOCATION
200 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The augers were removed in 15-foot sections and the inner annulus of the casing was alternately <br /> filled to the surface with cement grout to prevent caving of the surrounding formation <br /> Additional cement/bentonite grout was added to the well as appropriate as the casing was <br />' removed The well was completed in a traffic-rated utility box and fitted with a locking <br /> expandable cap. <br /> TABLE A-1 <br /> Well Construction Details <br /> MW-4 <br /> Total Depth 71 feet 407, 7�1 <br />' Screen Interval 50-70 feet Z'r"'! a <br />' Top of Sand 47 5 feet ,,z; r <br /> Bentonite Seal Interval 45.5-47.5 feat <br /> Casing Type PVC Schedule 40 <br /> Diameter of Casing 4 inch <br /> Sand Pack #1C Lonestar Sand <br /> Grout 3-5% bentonite and Portland I-II cement <br /> End Caps Flush-threaded screw-on bottom and expandable locking top <br /> Completion Flush Christy Box f 3 <br /> !i. ZG <br /> All measurements are in feet below ground surface {BGS} .f!, b C—C- <br /> IIS 2� , 7 <br /> Well Development <br /> After well installation was completed and the annular well seal had set for a minimum of 2� 31 <br /> hours, the well was developed. Initially, a pre-cleaned 3-inch-diameter bailer was used to <br /> remove fines which had accumulated in the well during construction After a majority of the <br />' fines were removed with the bailer, a 4-inch-diameter surge block was inserted into the well and <br /> used to surge the well screen interval approximately 20 times After the surge block was <br /> removed, the 3-inch bailer was used again to remove the fines that had entered the well during <br /> surging. The well was developed until fines were unnoticeable and the water was clear. <br /> Conductivity, pH, and temperature measurements were monitored and pumping continued until <br /> these parameters had stabilized. Parameters were considered stable when successive <br /> measurements were within 10 percent of each other. All development water was stored in 55- <br /> gallon drums pending results of the groundwater analyses. Well development data are included <br /> in Table A-2 of this report <br />' S XCNRffSMCMAD WP A - 5 1W12= <br />
The URL can be used to link to this page
Your browser does not support the video tag.