My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000299
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
2900 - Site Mitigation Program
>
PR0522015
>
ARCHIVED REPORTS XR0000299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 10:03:29 AM
Creation date
2/6/2019 10:02:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000299
RECORD_ID
PR0522015
PE
2950
FACILITY_ID
FA0015207
FACILITY_NAME
SJC MOSQUITO & VECTOR CONTROL DIST
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905031
CURRENT_STATUS
01
SITE_LOCATION
200 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE A-2 <br /> i Well Development Details <br /> MW-4 , <br /> Date developed July 15, 1992 <br /> Gallons water removed Approximately 55 <br /> Time bailed 2 5 hours <br /> Clarity of water at end of pumping Slight turbidity noted <br /> Development Method 3-inch bailer <br /> 1 WESTON surveyed the monitoring well on August 25, 1992 for elevation utilizing an <br /> engineering level and rod. The elevation relative to mean sea level (MSL) of existing <br /> monitoring well MW-1 was used as a reference elevation. The elevation of MW4 along with <br /> the elevations of the other SJCMAD monitoring wells is presented below <br /> Monitoring Well Elevations (MSL) <br /> MW-1 54 11 <br /> MW-2 54.24 <br /> MW-3 5400 <br /> MW-4 5443 <br /> The site work was performed in accord with WESTON's site specific health and safety plan, <br /> which was available onsite during field activities. A safety meeting was held with subcontractor <br /> personnel prior to starting work each day to review anticipated safety hazards and emergency <br />' procedures The field work for this project was performed under Level D personal protection. <br />' nXC\K"SISICMAD WP A - 6 IUJ12M <br />
The URL can be used to link to this page
Your browser does not support the video tag.