Laserfiche WebLink
• • aclaytoli <br /> e.o�. <br /> i <br /> light of that assignment. The services provided by Clayton in completing this project <br /> were consistent with normal standards of the profession. No other warranty, expressed or <br /> implied, is made. <br /> 2.0 SCOPE OF WORK <br /> The scope of work for this investigation involved evaluating soil at locations depicted on <br /> Figure 2. The investigation consisted of pre-field activities, field activities, laboratory <br /> analysis, data interpretation, and report preparation. <br /> 2.1 PRE-FIELD ACTIVITIES <br /> The purpose of the pre-field activities was to appropriately plan the work and to ensure <br /> ' that onsite personnel were prepared for potential safety hazards at the property. Prior to <br /> conducting the field activities Clayton completed the following: <br /> • Obtained a drilling permit from the San Joaquin County Environmental Health <br /> Department(SJCEHD). <br /> • Prepared a Site Health and Safety Plan (SHSP) to reflect the work proposed at the <br /> subject property. The SHSP detailed the work to be performed, safety precautions, <br /> emergency response procedures, nearest hospital information, and onsite personnel <br /> responsible for managing emergency situations. <br /> • Marked the proposed boring locations and the Site boundaries with white paint and <br /> notified Underground Service Alert(USA) at least 48 hours prior to performing field <br /> activities, as required by law. <br /> • Clayton also utilized a private utility locating service to ensure that the proposed <br /> boring locations were clear of underground utilities prior to drilling. All soil boring <br /> locations were cleared for subsurface utilities on April 14, 2005 by California Utility <br /> Surveys (CU Surveys) located in San Ramon, California. <br /> 2.2 FIELD ACTIVITIES <br /> On April 14, 2005 Mr. Craig Pelletier supervised the advancement of seven exploratory <br /> borings (SB-1 through SB-7) at locations depicted on Figure 2. Borings were placed <br /> based on site uses, building location, and accessibility, as follows: <br /> • SB-1: Drum storage area <br /> • SB-2: Drum storage area <br /> • SB-3: Sump/catch basin area <br /> • SB-4: Plate washing area <br /> • SB-5: Plate washing area (adjacent to floor drain) <br /> • SB-6: Press pit area <br /> • SB-7: Press pit area <br /> PUSS WROMCTS\2WS05628 M Service CompanyThwe 11 ESA.doc 2 <br />