My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3011
>
2900 - Site Mitigation Program
>
PR0530063
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 3:55:34 PM
Creation date
2/6/2019 3:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0530063
PE
2957
FACILITY_ID
FA0019769
FACILITY_NAME
FORMER SHELL GAS STATION
STREET_NUMBER
3011
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10018010
CURRENT_STATUS
01
SITE_LOCATION
3011 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
377
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N) <br /> CONESTOGA-ROVERS <br /> &ASSOCIATES <br /> June 30, 2009 Reference No.241015 <br /> -2- <br /> July 21,2009: We plan to destroy wells MW-1-49,MW-1-82,MW-2-50,and MW-2-82 on this <br /> day. These wells all have steel conductor casings which will need to be removed at a depth of <br /> approximately 2.5 feet below grade. If additional time is available on this day we will <br /> pressure-grout some of the shallow onsite monitoring wells. <br /> July 22,2009: The remaining shallow onsite monitoring wells will be pressure-grouted on this <br /> day. <br /> July 23,2009: Wells MW-10, MW-11,and MW-12,which are located in the Interstate 5 off-ramp <br /> planter area,will be pressure-grouted on this day. A traffic control subcontractor will be <br /> utilized to provide a safe work zone along the freeway off-ramp for well destruction activities. <br /> Any remaining time on this day will be used to complete any remaining work onsite. <br /> If you have any questions regarding this letter,please call Joe Neely at(707) 933-2361. <br /> Sincerely, <br /> CONESTOGA-ROVERS&ASSOCIATES <br /> Joe W. Neely,PG <br /> JN/mh/2 <br /> c.c.: Mr. Denis Brown,Shell <br /> Mr. Mark Owens,UST Cleanup Fund <br /> Ms. Margaret Lagorio,San Joaquin County Environmental Health Department <br /> Mr.Joseph Risso (adjacent property owner) <br /> Mr. Dan Keyser, Lival Properties LTD (property owner) <br /> Worldwide Engineering,Environmental, Construction,and IT Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.