My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3040
>
2900 - Site Mitigation Program
>
PR0529219
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 3:57:47 PM
Creation date
2/6/2019 3:54:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529219
PE
2950
FACILITY_ID
FA0019477
FACILITY_NAME
7-ELEVEN INC #14113
STREET_NUMBER
3040
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
10027018
CURRENT_STATUS
01
SITE_LOCATION
3040 W BENJAMIN HOLT DR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec • <br /> January 26,2009 <br /> Page 3 of 3 <br /> be measured in the temporary casing. A clean disposable bailer will then be used to collect the <br /> grab groundwater sample from each soil boring. <br /> The water samples will be collected by lowering a 0.5"-diameter stainless steel or disposable <br /> bailer through the temporary 0.75-inch-diameter PVC casing to groundwater. The groundwater <br /> will be bailed from the casing, decanted from the bailer into 40-ml VOA vials, and capped. Each <br /> VOA vial will be checked to ensure no bubbles are present, labeled, placed on ice, and <br /> transported to the laboratory under COC documentation. The water samples will be analyzed <br /> for TPHg, BTEX, MtBE, TAME, DIPE, EtBE, and TBA by EPA Method 82608. In addition, the <br /> samples will be analyzed for TPHo by EPA Method 8015M. <br /> Following collection of the soil samples, each boring will be tremie grouted from total depth to <br /> grade with neat cement. <br /> WASTE HANDLING AND STORAGE <br /> All rinsate water and soil cuttings generated during the advancement of GP-1 though GP-4 will <br /> be stored in 55-gallon drums at the site pending laboratory analysis for proper disposal. <br /> Should you have any questions regarding this site, please contact the undersigned at(916) 861- <br /> 0400. <br /> Sincerely, <br /> Stantec Consulting Corporation <br /> L G@p''o <br /> \ED)k. <br /> Damon Brown = a• 41� ?'• <br /> Ed Simonis, PG w 3 zz ro"t* <br /> Geologic Associate Senior Geol gi IS, <br /> Project Manager ,s ,• ;•'��, <br /> OF CAL\F� <br /> Attachments: <br /> Figures <br /> Tables <br /> cc: Mr. John Wainwright, Stantec, 308 East 4500 South, Suite 100, Murray, Utah 84101 <br /> 14113 GP <br />
The URL can be used to link to this page
Your browser does not support the video tag.