My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:09:00 PM
Creation date
2/6/2019 4:14:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGR <br /> K.Foley/20 January 1989 2 <br /> SOIL VAPOR SURVEY <br /> As part of a site characterization, WGR will conduct a SVS to better <br /> delineate the extent of volatile hydrocarbons in the subsurface. The survey will <br /> be conducted according to WGR's standard operating procedure for soil vapor <br /> . surveys included as Attachment 2. Approximately 30 soil vapor sampling points <br /> will be installed at 5 ft and 15 ft below grade at about 15 locations as <br /> indicated in Figure 2 of Attachment 1. The locations will vary depending on <br /> access and the location of underground obstacles, which will be identified by <br /> a line locating service. <br /> SUMMARY <br /> The objective of this proposed workplan is to better define the horizontal <br /> and vertical extent of volatile hydrocarbons in the unsaturated soil beneath the <br /> site. The results of the SVS will be utilized along with other information to <br /> design a more extensive site assessment plan. <br /> We appreciate your timely review of this workplan. We would like to <br /> schedule the SVS as soon as possible. If you have any questions or comments <br /> please call us at (415) 457-7595. <br /> Sincerely, <br /> Western Geologic Resources, Inc. <br /> Kahtleen A. Isaacson <br /> Project Hydrogeologist <br /> ad/KAI/ <br /> cc: Lisa Marinaro - Chevron USA <br /> Attachments: <br /> 1 - Figures <br /> 2 - SOP-1: Soil Vapor Survey Standard Operating Procedure <br /> 104 W PJA9 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.