Laserfiche WebLink
CP0034 ARCO #2133 AND CHEVRON #94275 -2- February 24, 2011 <br /> COMMINGLED PLUME ACCOUNT NUMBER 034 <br /> PRE-APPROVAL REQUEST NO. 7 <br /> All costs for corrective action must meet the requirements of Article 11, Chapter <br /> 16, Underground Storage Tank Regulations in order to be eligible for <br /> reimbursement. <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Amount <br /> Task* Pre- Comments <br /> Approved <br /> 1 Perform Semi-Annual GW monitoring in 25 wells <br /> for the first quarter of 2011 and 8 GWMWs for <br /> Quarterly the third quarter of 2011, gauging, monitoring, <br /> Monitoring and traffic control, sampling, lab analysis using EPA <br /> Sampling 25 methods 8015/8260B for TPH(g), TPH(d)—if <br /> GWMWs in Q1 $16,047 required, BTEX and Oxygenates, purge/decon <br /> and 8 wells in water disposal; includes cost for time, materials, <br /> 03 equipment, instruments, supplies, support, and a <br /> detailed QMR. <br /> 2 Perform Semi-Annual GW monitoring in 31 wells <br /> (on-site, off-site and public right of way), <br /> gauging, monitoring, traffic control, sampling, lab <br /> analysis using EPA methods 8015/8260B for <br /> TPH(g), TPH(d), if required, BTEX and <br /> Oxygenates, purge/decon water disposal; <br /> includes cost for time, materials, equipment, <br /> Prepare Semi- instruments, supplies, support, and a detailed <br /> Annual <br /> GW $5,500 Semi-Annual GW monitoring report. The Semi- <br /> Reports <br /> Annual GW monitoring reports shall have <br /> Reports historic gw elevation data, contaminant <br /> concentration data, figures showing iso- <br /> concentration maps for TPH(g), benzene, <br /> MTBE, GW flow gradient maps, electronic data <br /> format, conclusions, recommendations and <br /> revisions to the site conceptual model (if <br /> applicable). <br /> 3 All necessary project management for both the <br /> Project $5,980 sites, agencies coordination etc. for the duration <br /> Management of the next four semi-annual groundwater <br /> monitoring and wellheads replacement. <br /> TOTAL PRE- $31,849 <br /> APPROVED <br /> * Task descriptions are the same as those identified in Stantec Consulting <br /> Corporation's February 7, 2011, cost estimate. <br /> California En vironmental Protection Agency <br /> Z4'Recycled Paper <br />