My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:09:00 PM
Creation date
2/6/2019 4:14:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Products Company -2- November 23, 2005 <br /> * Task descriptions are the same as those identified in Secor's,October 5, 2005,cost pre-approval request. <br /> I <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additional tasks and costs are necessary and reasonable. <br /> • The work products must be acceptable to the County. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> " on the new scope of work. <br /> • Although I have referred to Secor's proposal in my pre-approval above, please be aware that <br /> you will be entering into a private contract: the State of California cannot compel you to sign <br /> any specific contract. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable corrdspondence from the County. <br /> Please call me if you have any questions at (916) 341-5796. <br /> Sincerely, <br /> Mark Owens, P.E., Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> cc: Lori Duncan, San Joaquin County Environmental Health Department, Stockton <br /> Brian Carey, Secor International Inc., Rancho Cordova <br /> California Environmental Protection Agency <br /> Co*Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.