My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:09:00 PM
Creation date
2/6/2019 4:14:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/26/01 THU 13:58 FAX 1 916 861 0430 SECOR-SACRAMENTO X1004 <br /> U 'ti.J <br /> 1.12 "Station" or "Stations" sba11 mean the Chevron service station 99-4275 at 2905 W. <br /> Benjamin Holt Dr_, Stocktmn,Califomia,and the ARCO service station 42133 at 2908 <br /> W.Benjamin Holt Dr.,Stockton, California,or either of them as the contma requires. <br /> 1.13 "Technical Committee' shall mean a committee composed of at least one <br /> representative of each of the participating patties and whose function shall be to <br /> supervise the investigation and rwnediation of the relevant site(s). <br /> 1.14 "Total Cass" shall mean the total of all. Costs incurred by the parties under this <br /> Armnent. Total Costs shall not include in-hawse costs or expenses. Costs shall not <br /> include settlements, judgenncls, legal fees or other expenses associated vvittr third <br /> Ply claims asserted against the parries. <br /> 1.13 'Vork" sball mean all of the investigation, manitorin& remediaticu and other <br /> activities and tal=by the parties to define and clean up the Contamination as may <br /> be required by the Agencies or undertaken by agreement of the parties under this <br /> Agreement. <br /> A11`MLIE 2-PURPOSE <br /> Mw purpose of this Agneemm is to provide_ 1) for the spring of Costs and information <br /> regarding the presence of Commination at the Stations both before the Relative <br /> Caatiilmr(ims have been determined and after such determination, as well as matters involved <br /> in the conduct and managenmut of the Work;2)provide access to each Station's property for <br /> the limited purpose of conducting the Work; and 3) subinit a joint claim for the costs of the <br /> Work to the SWRCB Underground Storage Tank Fund(Fuad}. Initially,Costs shall be shared <br /> equally by the panties_ After the Relative Comtributiow are determined,Costs will be shared in <br /> Proportion to each party's Relative Contribution, and Costs paid during the period of equal <br /> sharing before detem ination shall be promptly reimbursed by the party having the greater <br /> Relative Contribution to the other party so that Total Costs are shared in such proportion_ <br /> ARTICM 3-TERAS <br /> The term of the Agreer int shall commence on the date of execution of this Agreemesrt by the <br /> parties and shall continue until(1)the government agency(ies)overseeing the investigation and <br /> remediation of the centarnination authorize the cessation of said activities, or(2) either party <br /> Provides zottce to the other that the agreement has been terminated, which tamun aon date <br /> shall be thirty(330)days from the date of such notive. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.