Laserfiche WebLink
i <br /> 1.0 INTRODUCTfON <br /> This report describes the procedures and presents the resuits of cone penetration testing <br /> (CP'?and BAT groundwater sampling conducted at Che%ron Station No.9"4275,29M Benjamin <br /> Holt Drive,Stockton,California. The objectives of this investigation were: <br /> demonstrate the ability of the CPT to characterize the site geology and <br /> hydrogeology, and <br /> (ii) demonstrate the accuracy of the CPT- installed BAT sampling system relative to <br /> the California Code of Regulations (CCB) Title 23 groundwater monitoring well <br /> samples. <br /> - The field work was perro�med on March 11 and 12, and October 21, 1991. <br /> The equipment and procedures used are described in Section 20. Section 3.0 describes the <br /> CPT data interpretation methodology. Section 4.0 presents the results of the CPT and BAT <br /> tasting and sampling program. CPT data logs are contained in Appendix A. <br /> In conjunction with the CPT and BAT Sampling Program,monitoring wells onsite were sampled <br /> according to standard protocol to assess the potential use of the BAT system for long term <br /> - monitoring. Discussion of the monitoring well construction and installation, the sampling <br /> techniques and analytical methods are beyond the scope of this report. However, the <br /> general analytical results for the B,T system and for the monitoring wells are discussed <br /> in Section 4.0 and conclusions and recommendations are presented in Section 5.0. Complete 3 <br /> pendix B. <br /> analytical results are presented in Ap <br /> j <br /> - i <br /> i — <br /> i <br /> f <br /> f <br /> t <br /> - e <br /> t <br /> J; <br />