Laserfiche WebLink
r <br /> CHEVRON WELL MONITORING DATA SHEET <br /> Project # a } , Station-# q q2-75-- — - <br /> Sampler / l 1 Start Date ICS - ){ <br /> Well I D L/ Well Diameter t (circle one) 3 4 6 <br /> Total Well Depth Depth to Water <br /> Before ;f, ICI After Before 5 3r? After <br /> Depth to Free Product* Thickness of Free Product (feet) <br /> Measurements referenced toGrade Other <br /> Well Diameter �VCF Well Diameter VCF <br /> 1" 0 04 6" 1 47 <br /> 2" 0 16 8" 2 61 <br /> 3" 0 37 10" 4 08 <br /> 4" 0 65 12" S 87 <br /> 5" 1 02 16" 10 43 <br /> � <br /> . o X 3 � _ a <br /> 1 Case Volume Specified Volumes gallons <br /> Purging Bailer Sampling Bailer <br /> Disposable Bailer Disposable Bailer <br /> MiddleburgExtraction Port <br /> Electric Submersible,----- Other <br /> Extraction Pump <br /> Other <br /> TIME TEMP pH COND TURBIDITY VOLUME OBSERVATIONS <br /> (F) REMOVED <br /> JI D J51K,- Z 7 9 2 0- <br /> IN)-7 5; 7 9 -7- 5- (09 q L1. O <br /> Did Well Dexater' If yes, gals Gallons Actually Evacuated <br /> Sampling Time 1 Sampling Date <br /> Sample I Dnp Laboratory <br /> Analyzed for. H-G BT TPH-D OTHER <br /> (Circle) <br /> Duplicate I D Cleaning Blank I D <br /> Analyzed for- TPH-G BTEX TPH-D OTHER: <br /> (Circle) <br />