Laserfiche WebLink
CHEVRON WELL MONITORING DATA SHEET <br /> Project # G y�- � Station # 6� 2-75' <br /> Sampler Start Date I / I- '�f' s <br /> well I D Well Diameter (circle one) C2) 3 4 6 <br /> Total Well Depth Depth to Water. <br /> Before 0-1 1 K After Before i A - Z3 After ` `�L Z <br /> Depth to Free Product Thickness of Free Product t(feet) <br /> Measurements referenced to PVC Grade Other <br /> Well Diameter VCF Well Diameter VCF <br /> 1" 0 04 6'. 1 47 <br /> 4" 0 65 12" 5 87 <br /> 51, 1 02 16" 10 43 <br /> X I '( <br /> 1 Case Volume Speca-famed Volumes = gallons <br /> Purging BailerSampling Bailer <br /> Disposable Bailer,---- Disposable Bailer <br /> Middleburg Extraction Port <br /> Electric Submersa.ble Other <br /> Extraction Pump <br /> Other <br /> TIME TEMP pH COND TURBIDITY VOLLTME OBSERVATIONS <br /> (F) REMOVED <br /> Z1 7, Z <br /> Did Well Dewater7 ki If yes, gals Gallons Actually Evacuated <br /> Sampling Time• I/L3 Sampling Date <br /> Sample I D Laboratory <br /> Analyzed for r TPii-G BTE TPH-D OTHER } <br /> (Ca.rC le) <br /> Duplicate I D Cleaning Blank I D <br /> Analyzed for TPH-G BTEX TPH-D OTHER, <br /> (Circle) <br />