Laserfiche WebLink
' GERAGHTY E? MILLER, INC 9 <br /> If you have any questions regarding this report or need further information, please do <br /> not hesitate to call us at (510) 233-3200 <br /> ' Sincerely, <br /> GERAGHTY & MILLER, INC <br /> Aaron O'Brien <br /> Staff En nee Manager <br /> Kent O'Brien <br /> Project Geologist <br /> 1 _ 1 <br /> Opal <br /> W. <br /> I ociate <br /> i al Manager <br /> erences <br />' Table 1 Soil Sample Analytical Results <br /> Table 2 Air-Sparging Sample Analytical Results <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Maximum Concentrations of Petroleum Hydrocarbons in Soil <br /> Figure 4 Remediation System Installation <br /> Figure 5 Remediation Well Construction Details <br /> Figure 6 Proposed Location for Vertical Delineation Soil Boring <br />' Attachment 1 Assessment Activities <br /> Attachment 2 Remediation Well Installation and Boring Logs <br />' Attachment 3 Groundwater Monitoring Report(Blaine Tech, March 25, 1997) <br /> Attachment 4 Copies of Certified Analytical Reports and <br /> Chain-of-Custody Documentation <br /> cc Brett Hunter,Chevron Products Company <br /> Elizabeth Thayer,RWQCB —Central Valley Region <br /> Paul Supple, ARCO Products Company <br />' Steve Misner,Brown&Caldwell <br />' <br /> Project No. RC0309.010 <br />' �S <br />