Laserfiche WebLink
S E C 0 R <br /> Ms. Lori Duncan <br /> May 12, 2006 <br /> Page 3 <br /> The documentation of these well installations and development will be included in a Site <br /> Conceptual Model following installation of the remaining Chevron wells (MW-5R, MW-7R, <br /> and MW-91R), scheduled for the second quarter 2006. <br /> On March 20, 2006, depth to groundwater in the monitoring wells ranged from 4.69 to 8.28 <br /> feet below ground surface (bgs). Groundwater flow across the site was to the north- <br /> northeast at a hydraulic gradient of 0.003 foot per foot (ft/ft). A groundwater elevation <br /> contour map of the two sites is presented as Figure 2. Groundwater concentrations for both <br /> sites are summarized for TPHg, benzene, and MtBE as Figure 3. Chevron's and ARCO's <br /> groundwater elevation and analytical data are summarized in Tables 1 and 2, respectively. <br /> Chevron's and ARCO's groundwater analytical data for oxygenated compounds are <br /> presented in Tables 3 and 4, respectively. Historical groundwater gradient data are <br /> presented in Table 5. Field and laboratory procedures are provided in Attachment A. The <br /> laboratory analytical report and chain-of-custody documents are provided in Attachment B, <br /> and field data sheets are provided in Attachment C. <br /> REMEDIAL RESULTS SUMMARY (CHEVRON) <br /> Operation of the SVE and AS systems was initiated at the site in April 1997. The SVE <br /> system has been disabled and the AS system was shut down in April 2005 and removed in <br /> May 2005 as a result of the service station teardown and rebuild. <br /> The inactive SVE system was comprised of ten SVE wells (VW-1 and GM-1 through GM-9), <br /> underground mechanical piping, a 5-horsepower (hp) positive displacement blower, and <br /> 100-cubic feet per minute (cfm) catalytic oxidizer (Figure 4). The SVE system has not <br /> operated since February 1998. The SVE wells were destroyed and the remediation <br /> equipment was removed from the site in May 2005. <br /> The inactive AS system was comprised of nine AS wells (GM-1 and GM-9), underground <br /> mechanical piping, and a 1.5-hp rotary vane air compressor. The AS wells were destroyed <br /> and the remediation equipment was removed from the site in May 2005. <br /> REMEDIAL RESULTS SUMMARY (ARCO) <br /> Cumulative Free Product Recovered to 642 pounds (lbs) <br /> Date: <br /> Cumulative TPHg Removed by 3,980 lbs <br /> Groundwater Extraction: <br /> Total Groundwater Extracted: 32,000,000 gallons <br /> TPHg Removed by SVE this quarter: None <br /> Cumulative TPHg Removed by SVE: 4,897 lbs <br /> MtBE Removed this Quarter: None <br /> Cumulative MtBE Removed: 4.5 lbs <br /> Measured Depth to Groundwater: 4.69—8.28 feet <br /> 1AChevron1942751REP0RTSIQ M R1200611Q06.doc <br />