My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000402
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:51:39 AM
Creation date
2/7/2019 9:07:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000402
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fsuuue f rUK VVCLL fn,IALLA 11UN ANU 111tPUKI ING Date: 05-Oct-05 <br /> Commingle Plume#0035 <br /> ARCO 2133/Chevron 9-4275 Project Manager: Brian Carey <br /> 2908 Benjamin HoIV2905 Benjamin Holt SECOR Rate Set: 2005A <br /> Stockton, California <br /> ;RAS ..}, Maalrku @nSitxll ' ..t� N�.�u, to i' <br /> �i�a flit i; ?LAIII AN h �Eji7li"I"`�jhit s £29 M "1� $4rt1 T 4� <br /> �o s, i1E.. _ s_�.�a <br /> (Prepare and submit monitoring well Installation work plan to the SJCEHD for review and approval) <br /> (Prepare and obtain well installation permits from San Joaquin County for a total of 1 well and 10 borings) <br /> (Assume one trip to site to mark boring locations for USA and the subcontracted costs for a private utility locator to Gear each location) <br /> (Prepare Health and Safety Pian to cover well installation) <br /> Monitoring Well Install Work Pian $1,598.00 <br /> Principal Geologist 1 hours $125.00 $125.00 <br /> Senior Geologist 3 hours $105.00 $315.00 <br /> Staff Geologist 11 12 hours $79.00 $948.00 <br /> Drafter II 2 hours $55.00 $110.00 <br /> Administrator II 2 hours $50.00 $100.00 <br /> Labor-Health&Safety Plan $330.00 <br /> Senior Geologist 1 hours $105.00 $105.00 <br /> Staff Geologist 1 3 hours $75.00 $225.00 <br /> Labor-Permits&Utilily Location $1,705.00 <br /> Senior Geologist 3 hours $105.00 $315.00 <br /> Staff Geologist 11 10 hours $79.00 $790.00 <br /> Staff Geologist I (utility location) 8 hours $75.00 $600.00 <br /> Permitting-SJCEHD $409.40 <br /> SJCEHD Well Permit fee(per parcel) 4 each $89.00 15% $409.40 <br /> Other Direct Charges $85.00 <br /> Truck Charge for USA marking 1 day $75.00 $75.00 <br /> Misc. Expenses(copies, film, etc.) 1 each $10.00 $10.00 <br /> Subcontractors Costs $690.00 <br /> Utility Locator 6 hours $100.00 15% $690.00 <br /> lL TIONa _v . , e,s- -rte- $86f55Z 25'g <br /> (Includes scheduling,coordination,subcontractor costs,and field labor to oversee the installation of the Monitoring Wells and Soil Borings) <br /> 1) 10 soil borings to 70 feet bgs with 2 Hydropunch samples per boring. <br /> 2) 1 monitoring well to 20 feet bgs with a 15 ft screen set at 5 to 20 feet. <br /> (Assume a total of 10 field days will be required to complete field work) <br /> (Assumes select sol samples will be analyzed for STEX.TPHg,and Oxygenates using EPA method 826013) <br /> (The budget Includes the subcontracted cost to survey the vertical and horizontal locations of the new wells) <br /> (Ail decon and development water will be placed in drums for offsite disposal and the drill cuttings will be drummed) <br /> Well Installation&Development-Coordination&Scheduling $1,953.00 <br /> Registered Geologist 3 hours $125.00 $375.00 <br /> Senior Geologist 6 hours $105.00 $630.00 <br /> Staff Geologist II (site) 12 hours $79.00 $948.00 <br /> Well Installation-Field Labor $11,060.00 <br /> Staff Geologist 11 (site) 120 hours $79.00 $9,480.00 <br /> Staff Geologist li (travel) 20 hours $79.00 $1,580.00 <br /> Well Development-Field Labor $948.00 <br /> Staff Geologist II (site) 10 hours $79.00 $790.00 <br /> Staff Geologist 11(travel) 2 hours $79.00 $158.00 <br /> Other Direct Charges $2,150.00 <br /> SECOR Field Truck 11 day $70.00 $770.00 <br /> PID Rental 10 day $100.00 $1,000.00 <br /> Water Level Indicator 10 day $15.00 $150.00 <br /> Misc. Materials 4 each $50.00 15% $230.00 <br /> Subcontractors Costs $59,225.00 <br /> Well Installation(estimate based on 1 bid $50,000.00 15% $57,500.00 <br /> actual drill bid) <br /> Well Surveying 1 bid $1,500.00 15% $1,725.00 <br /> Laboratory Fees(Kifn $7,906.25 <br /> (Assume analyses of four soil samples per boring from 11 borings) <br /> TPHg/BTEX/Oxys, (EPA 826013)Soil 40 sample: $110.00 15% $5,060.00 <br /> TPHg/BTEX/Oxys, (EPA 826013)Water 15 sample: $110.00 15% $1,897.50 <br /> BTEX/TPHg/MTBE(drill cuttings profile) 2 sample: $50.00 15% $115.00 <br /> Total Lead(Drill cuttings profile) 2 sample: $50.00 15% $115.00 <br /> EDF Report 1 each $625.00 15% $718.75 <br /> Geotracker Upload $3,310.00 <br /> Project Scientist 8 hours $90.00 $720.00 <br /> Staff Scientist 18 hours $105.00 $1,890.00 <br /> Assistant 10 hours $70.00 $700.00 <br /> File;ProjectslConocoPhillips16004lbudgets12005 Site Assessment budget CP0034.xis Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.