My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000402
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0000402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 9:51:39 AM
Creation date
2/7/2019 9:07:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000402
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUDGET FOR WELL INSTALLATION AND REPORTING Date: 05-Oct-05 <br /> Commingle Plume#0036 <br /> ARCO 2133/Chevron 9-4275 Project Manager: Brian Carey <br /> 2908 Benjamin HoIV2905 Benjamin Holt SECOR Rate Set: 2005A <br /> Stockton,California <br /> Phase 77-704107sFF, .Marisa <br /> ............... <br /> TALEA1 <br /> 10617-17WEEL-198 <br /> (Includes preparation and submittal of well installation summary report to the client,SJCEHD,and the RVVQCB) <br /> Ile (Report will include a summary of the new data from the 11 borings and historical soil and water data) <br /> Labor $4,498.00 <br /> Registered Geologist 6 hours $125.00 $750.00 <br /> Senior Geologist 1 6 hours $105-00 $630.00 <br /> Staff Geologist 11 32 hours $79.00 $2,528.00 <br /> Administrator 11 3 hours $50.00 $150.00 <br /> Drafter 11 8 hours $55.00 $440.00 <br /> ................ <br /> .. ...... ........ <br /> ............... I <br /> `7727773k <br /> 01�4-;`WASYM.- 77 , <br /> �0 19 P_0 LS-A C-71, <br /> (includes coordination of Integrated Wastestream Management to remove and dispose of purge water) <br /> (Assume a total of 20 cubic yards of drill cuttings Will be disposed of at Forward Inc.by Manley Trucking) <br /> Labor.Coordinate Water Disposal $500.00 <br /> Senior Geologist 1 1 hours $105.00 $105.00 <br /> Staff Geologist 11 5 hours $79.00 $395.00 <br /> Waste Removal and Disposal Charges $7,889.00 <br /> IWM Water Disposal 10 drum $125.00 15% $1,437.50 <br /> IWM Soil Disposal 40 drum $125-00 15% $5,750.00 <br /> IWM Transportation 8 hrs $70.00 15% $644.00 <br /> IWM Bid waste profiling/management fee 1 fees $50.00 15% $57.50 <br /> UDGETT SumSUMMARY ;A <br /> Budget encompasses site assessment,well Installation,reporting,and Geotracker upload of data. <br /> WORK PLAN'AN:PPERMITTING; I .tn . 4i'811'7"-WV, <br /> [002 .,WEL 'INST X -77""7777' , �fia�6,62�2s1 �fi <br /> 100&, .,WELL-'INS.T-ALWION'REPORT. A. 4,498.041,- -t Event "*C499-00" <br /> J <br /> a MOM]" -'rzwint .004. ,-,,�,,,WA4,TT6VSP0SAL <br /> 11'PROPOSED l3URGET TOTTAL-;' <br /> 256."S <br /> File:projectskCono-Phillips160041budgeta12005 Site Assessment budget CP0034.xis Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.