Laserfiche WebLink
S E C 0 R <br /> Third Quarter 2004, Groundwater Monitoring Report <br /> November 10, 2004 <br /> Page 3 <br /> Attachment B. ARCO's laboratory analytical results, chain-of-custody documents, and field data <br /> sheets are provided as Attachment C. <br /> REMEDIAL RESULTS SUMMARY (CHEVRON) <br /> Operation of the soil vapor extraction (SVE) and air sparge (AS) systems were initiated at the site in <br /> April 1997. The SVE system has been disabled and the AS continues to operate. A brief description <br /> and performance evaluation of the remedial system between March 05, 2004 and Mune 11, 2004 are <br /> presented below. <br /> The inactive SVE system is comprised of ten SVE wells (VW-1 and GM-1 through GM-9), <br /> underground mechanical piping, a 5-horsepower (hp) positive displacement blower, and 100-cubic <br /> feet per minute (cfm) catalytic oxidizer (Figure 2). During 3Q04, the SVE system did not operate due <br /> to high groundwater levels. The SVE system has not operated since February 1998. <br /> On September 21, 2004, depth to water in the monitoring wells at the site ranged from 11.60 to <br /> 13.25 feet below ground surface (bgs). The screened intervals in the SVE wells range from 10 to 17 <br /> feet bgs; therefore water levels are currently too high for effective operation of the SVE system. <br /> The AS system is comprised of nine AS wells (GM-1 and GM-9), underground mechanical piping, <br /> and a 1.5-hp rotary vane air compressor. During 3004, the AS system was operational for 98% of <br /> the reporting period at an average flow rate of 15.2 standard cubic feet per minute (scfm) and an <br /> average injection pressure of 5.5 pounds per square inch gauge(psig). <br /> CHEVRON's AS system operational data is presented in detail as Attachment D. 3 <br /> REMEDIAL RESULTS SUMMARY (ARCO) <br /> Cumulative FP Recovered to Date: 642 lbs <br /> Cumulative TPHg Removed by GWE: 3,980 lbs <br /> Total Groundwater Extracted: 32,000,000 gal <br /> TPHg Removed by SVE this quarter: None <br /> Cumulative TPHg Removed by SVE: 4,897 lbs <br /> MtBE Removed this Quarter: None <br /> Cumulative MtBE Removed: 4.5 lbs <br /> Approximate Depth to Groundwater: 8.63—9.48 ft <br /> ARCO's historical SVE data and recent AS system operational data are presented in detail in <br /> Attachment E. <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> With the exception of a significant decreasing MtBE concentration trend observed in Chevron well <br /> MW-1 over the last three consecutive quarters since the fourth quarter 2003, groundwater flow <br /> direction, hydraulic gradient, groundwater concentrations reported during 3Q04 are consistent with <br /> historical data. <br /> Due to the site's commingled plume status, SECOR will take over the responsibility of conducting <br /> groundwater monitoring and sampling activities at both the CHEVRON and ARCO sites during the <br /> I:%Chevron1942751Peri0dic Monitoring\Q M R1200413Q04.d0c <br />