Laserfiche WebLink
KYLE CHRISTIE <br /> . PAGE 5 <br /> current data from the area of monitoring well MW#2, ARCO would like to postpone the confirmation <br /> drilling until such a time that the other site data indicate it to :be warranted. PHS/EHD agreed that this <br /> was a more cost effective approach. The San Joagiun Valley Unified Air Pollution Control District has <br /> approved the biofilter for use in place of the,Catalytic converter. A hew.blower has been purchased.to <br /> allow remediation to continue at the site once the catalytic converter is moved to ARCO .station #2093 <br /> in Tracy. <br /> The environmental assessment conducted across Kettleman Lane at 514 Kettleman Lane has been <br /> completed with the installation of two monitoring wells. The report has not yet been submitted but <br /> preliminary results indicate no contamination in the soil or the groundwater. The-report should be <br /> submitted soon and will be available for public review:; <br /> Summary <br /> The meeting allowed for continued communication between all parties and for <br /> continued progress at the sites. The next meeting to discuss site progress was <br /> scheduled tentatively for February 14, 1994 at 10:00 AM at the office of PHSIEHD. .. <br /> If you disagree with this summary of'the November 14, 1994 meeting or have any <br /> questions, please contact me at (209) 468-3452. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Diane M. Hinson`; REHS <br /> Supervisor <br /> c: Elizabeth Thayer, CVRWQCB c: Jay Johnson, 'EM CON <br /> c: Ron Zurlinden, B&C c: Steve Meisner, B&C <br /> fi <br />