My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of shielding, then County variance will be sought. Variance <br /> from client and Stantec required. <br /> Pressure Overhead (station awning); Sanitary sewer 1'4" northeast of <br /> V-6(A) Over-drill Grout well column (6" deep); Product lines 3' south of well column <br /> (depth undetermined). Variance from client and Stantec <br /> require .Variance from County required. <br /> Overhead utility (unknown voltage) 7' southwest (15' high); <br /> Over-drill No will install shielding on overhead lines and install conductor <br /> V-7(A) casing to protect sewer. If overhead lines cannot be shielded, <br /> then County variance will be sought. Variance from client <br /> and Stantec required. <br /> Over-drill Pressure Sanitary sewer 1'6" northeast of well column (7" deep); tank <br /> V-8(A) Grout pit 2' south of well; Variance from client and Stantec <br /> required.Variance from County required. <br /> V Over-drill No Overhead utility (unknown voltage) 8' southwest @ 15'; had <br /> 9(A)/ overhead line removed, will have system decommissioning <br /> S-7(A) done prior to well abandonment. <br /> Subsurface electrical line to station lighting 1'6" east of well <br /> V- Over-drill No column (1' deep); Stantec will provide lock out tag out to <br /> 12(A) limit electrical shock exposure. Variance from client and <br /> Stantec required. <br /> Underground electrical line 6" north of well column (1'9" <br /> Over-drill Pressure deep) Stantec will provide lock out tag out to limit electrical <br /> S-2(A) Grout shock exposure. Variance from client and Stantec required. <br /> Variance from County required. Serious potential for <br /> electrical line to get caught onspinning augers. <br /> PressurSanitary sewer 1'9" northeast of well column (6" deep); <br /> SAW Over-drill Grout e adjacent multiple tank pits (8'). Potential product lines in <br /> play. Variance from client and Stantec required. Variance <br /> from County required. <br /> Tank Pit 6.5' north of well box; Overhead utility (unknown <br /> voltage) 9' south @ 15'&25' high; will install shielding on <br /> S 5(A) Over-drill No overhead lines and install conductor casing to protect sewer. <br /> If overhead lines cannot handle added weight of shielding, <br /> then County variance will be sought. Variance from client <br /> and Stantec required. <br /> Overhead utility(unknown voltage) 9' south @ 15'&25' high; <br /> had lower overhead line removed by utility company. Will <br /> S-6(A) Over-drill No install shielding on upper overhead line. If overhead line <br /> cannot handle added weight of shielding, then County <br /> variance will be sought. Variance from client and Stantec <br /> re uired. <br /> Well Abnormal Conditions <br /> I.D. <br /> Pressure 12.1" well casing will not fit inside 18" augers for over drill. <br /> R-1(A) Over-drill Grout Request abandonment via 10.3 sack sand slurry mixture. <br /> Variance from client and Stantec required. <br /> All of the other wells will be over-drilled.We still have a meeting with utility company to evaluate <br /> shielding request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.