Laserfiche WebLink
San Joaquin County DIRECTOR <br /> Donna Hera RENS <br /> ASSISTANT Department DIRECTOR <br /> Z i 2 600 East Main Street Laurie Cotulla,REHS <br /> ": :{ Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> >, Mike Huggins,REHS,RDI <br /> c•. _�- p Margaret Lagorio, REHS <br /> qui F�Rci\ Website: www.sjgov.org/ehd Robert McClellon,REHS <br /> Phone: (209) 468-3420 ,teff Carruesco, REHS,RDI <br /> Fax: (209)464-0138 Kasey Foley,REHS <br /> June 8, 2009 <br /> Stephanie Furgal Sergio Morescalchi <br /> Chevron Environmental Management Company Atlantic Richfield Company <br /> 6001 Bollinger Canyon Road Room K2240 PO Box 1257 <br /> San Ramon, CA 94583 San Ramon, CA 94583 <br /> Subject: Chevron #9-4275 and ARCO #2133 CUF Claim # CP0034 <br /> 2905 & 2908 Ben Holt Drive <br /> Stockton, CA 95207 <br /> San Joaquin County Environmental Health Department (EHD) has reviewed Quarterly <br /> Groundwater Monitoring Report First Quarter 2009 (Report) dated May 29, 2009, <br /> submitted on your behalf by Stantec Consulting Corporation (Stantec) and has the <br /> following comments. <br /> The Report documents the results of a routine quarterly groundwater monitoring and <br /> sampling event that was performed at the above referenced contaminated underground <br /> storage tank co-mingled plume site on January 8-9, 2009. Analytical results were <br /> consistent with historical data in reporting low levels of contamination in the groundwater <br /> across the Chevron site to the north, and high concentrations centered around monitoring <br /> well E-10 on the ARCO site to the south. <br /> In the Report Stantec proposes the reduction of sampling of wells MW-1R, MW-3R, <br /> MW-6, MW-7R, MW-8, MW-9R and MW-10, (all installed as part of the Chevron site <br /> investigation) from a quarterly to an semi-annual schedule. The State Water Resources <br /> Control Board (SWRCB) has directed all sites consider switching to a semi-annual <br /> schedule of groundwater monitoring and sampling. The EHD recommends all wells on the <br /> Chevron side of the site be sampled on an annual schedule, with the exception of wells <br /> MW-2 and MW-5R which should be sampled on a semi-annual schedule. The EHD further <br /> recommends reductions in the analytical regimen of the Chevron wells. All wells should <br /> be analyzed for methyl tertiary butyl ether (MtBE). Wells MW-2R, MW-5R and MW-9R <br /> should also be analyzed for total petroleum hydrocarbons as gasoline (TPHg) and tertiary <br /> butyl alcohol (TBA), and well MW-6 should also be analyzed for TPHg. <br /> The EHD recommends all wells on the ARCO site be switched to an annual sampling <br /> schedule except wells E-3, E-4, E-6, E-9 and E-10, which should be sampled on a semi- <br /> annual schedule. All ARCO wells should be analyzed for TPHg and MtBE; well E-10 <br /> should also be analyzed for benzene, toluene, ethylbenzene, xylenes and TBA. <br />