My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
yam, ter' <br /> ARCO Meeting Minutes <br /> August 8, 1994 <br /> Page 6 <br /> Linda states that Cal-Trans has requested information on this site for street widening purposes. <br /> ARCO 760, Lodi (Linda Turkatte) <br /> Linda said that she received the first quarter status report which included the results of the <br /> additional assessment performed in January, 1994 that consisted of a groundwater investigation <br /> and further assessment of soil in the vicinity of the waste-oil tank. Linda stated that gasoline <br /> hydrocarbons were detected in the groundwater,though at low concentrations;groundwater flow <br /> direction was to south;characterization of soil north and west of the waist-oil tank had not <br /> conducted but was requested by PHS/EHD. EMCON stated that they had just received the <br /> results of the second quarter groundwater sampling event,which reports gasoline hydrocarbons <br /> again at very low concentrations(most compounds below MCLs);the flow direction had shifted to <br /> the east in the second quarter;off-site assessment of soil was originally planned, however <br /> access to adjacent properties had not been granted at the time field operation were scheduled to <br /> begin. ARCO told Linda that on two occasions in 1993, an access agreement was sent to the <br /> property owner north of the site but did not get a reply. EMCON told Linda that the City of Lodi, <br /> when contacted in the beginning of 1994, was in the process of selling the alley to adjacent <br /> property owners and therefore could not grant access to the alley way;access to the alley would <br /> have to be obtained in the future once a owner of the alley property had been established. Linda <br /> told ARCO and EMCON to resubmit another access agreement to the property owner north of <br /> the site and to contact the City of Lodi to find out the status of the alley property. She also would <br /> like a brief discussion in the quarterly status reports outlining activities performed in obtaining <br /> access to properties. <br /> Linda also had concerns regarding the groundwater sampling protocol of ARCO's groundwater <br /> sampling contractor. Linda said that she has not been able to observe their sampling procedures <br /> because they do not adhere to their set sampling schedule. <br /> ARCO 2093, Tracy(Harlin Knoll) <br /> Harlin says that when he went to the site to meet with BC technician to check the EZ-Skimmer <br /> that was placed in Well ATR-8,the skimmer had 8 inches of product in the well. This does not <br /> mean that there was 8 inches of product in the well. BC believes that the free product is much <br /> less bases on recovery rates and field observation by BC's technician. <br /> Chris Winsor says that ARCO should try to finger print the free product in the well to determine if <br /> it is even ARCO gas. <br /> e <br /> Harlin believes that the hydrocarbon plume is migrating off site based on the minor hit of xylenes , <br /> in well ATR-9 in the fourth quarter 1993. <br /> BC and ARCO should look into obtaining a NPDES permit for this site. the nearest storm drain is <br /> in Tracy boulevard north of the site. Contacts for NPDES permitting would be Beth Thayer or <br /> Wayne Pearson of the RWQCB. <br /> Kyle says to redevelop ATR-8. Kyle asked Harlin if ARCO can proceed with on site remediation <br /> with out first investigating off site free product to the north. Harlin says to go ahead. ARCO will <br /> pursue free product off site after the remediation system is installed. <br /> f <br /> S <br />
The URL can be used to link to this page
Your browser does not support the video tag.