My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SERVICES <br /> SAN JOAQUIN COUNTY Z' <br /> JOGI KHANNA M.D.,M.P.H. <br /> Health Officer P <br /> P.O. Box 2009 (1601 East Hazelton Avenue) •Stockton, California 95201 <br /> CiFo.a�: <br /> (209) 468-3400 <br /> CHUCK CARMEL <br /> ARCO PRODUCTS COMPANY L P O BOX 5811 <br /> SAN MATEO CA 94402 AUG 1 1993 <br /> RE: Village ARCO #2133 SITE CODE: 1021 <br /> 2908 West Benjamin Holt <br /> Stockton CA 95207 <br /> During the March 30, 1993 meeting held between PHS/EHD representatives and ARCO <br /> representatives, PHS/EHD expressed concern regarding the speed of the investigation and <br /> remediation of petroleum hydrocarbon contamination associated with former leaking <br /> underground storage tanks. <br /> i <br /> At the March 1993 meeting, a number of agreements were reached and a time schedule for <br /> implementation was established. PHS/EHD is concerned that these goals have not been <br /> achieved. Below is a summary of the agreements and an evaluation of the progress to date. <br /> 1. Quarterly reports would be submitted prior to the next sampling event. <br /> PHS/EHD received the "First 1993 Quarterly Report" dated March 17, 1993 <br /> and prepared by Brown and Caldwell (BC) which included-,the results of <br /> quarterly sampling performed on January 27, 1993. To date, PHS/EHD has <br /> not received the second quarterly report which would have included the results <br /> of sampling performed on April 29, 1993. The third quarter sampling event <br /> occurred August 5, 1993. <br /> During the March 1993 meeting,PHS/EHD agreed to accept EMCON's short- <br /> form quarterly report for 3 of the 4 reporting quarter to expedite report <br /> submittal for our evaluation. It is imperative that our evaluation of the <br /> quarterly data occur prior to subsequent sampling events. If your consultant <br /> is unable to provide this format in a timely fashion, PHS/EHD requests that <br /> we discuss an alternative reporting format that will facilitate the expeditious <br /> transmission of the quarterly data. Please submit the second quarterly report <br /> immediately. <br />
The URL can be used to link to this page
Your browser does not support the video tag.