My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:29:29 PM
Creation date
2/7/2019 10:28:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chuck Carmel <br /> Page 2 <br /> 2. The off-site investigation which had been approved and included the <br /> installation of a monitoring well to the west of the site and a soil boring to <br /> the south of the site,was to proceed once encroachment agreements had been <br /> obtained. <br /> PHS/EHD received correspondence, dated March 17, 1993 and prepared by <br /> BC, which requested the California Department of Transportation's <br /> (CalTrans) permission to drill a monitoring well on their property located to <br /> the west of the site. PHS/EHD discussed with CalTrans on May 5, 1993, the <br /> necessity of this well. PHS/EHD is unclear of the status of this request since <br /> PHSJEHD has not received copies of correspondence from CalTrans. <br /> PHS/EHD has not received copies of correspondence that would indicate <br /> negotiations have been initiated between ARCO and the property owner to <br /> the south of the site. <br /> However, PHS/EHD has received two permit applications and a $178 check <br /> for both the proposed off-site investigations. The check is being returned (BC <br /> enclosure) because the 90 day holding period has been exceeded. <br /> Please provide an update on the status of these projects and submit a check <br /> i <br /> for $178 once encroachments agreements have been obtained. <br /> 3. A work plan would be submitted by May 31, 1993,for the installation of a soil <br /> remediation system consisting of vapor extraction and air sparge wells and <br /> for the installation of an additional on-site monitoring well which was to be <br /> located in the north-west corner of the site. <br /> A work plan was submitted by May 31, 1993, although it was incomplete. The <br /> "Work Plan for Additional Installation of Soil Vapor Extraction, Air Sparge <br /> Wells and Monitoring Wells", dated May 14, 1993 and prepared by BC <br /> included information regarding the location of air sparge wells and the <br /> location and construction of vapor extraction wells. <br /> The work plan did not provide details of the construction of the air sparge <br /> wells nor did it locate the monitoring wells eluded to therein. The statement <br /> included in the work plan '"The final location and construction of these <br /> monitoring wells will be dependent on site access and will be determined at <br /> a later time" is unclear, when at the March 30, 1993 it was determined that a <br /> well would be located in the north-west corner of the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.