My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:07:10 PM
Creation date
2/7/2019 10:31:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Well Construction Details <br /> ARCO Service Station No.2133 and Chevron Service Station No.9-4275 <br /> 2908 2905 West Benjamin Holt Drive <br /> Stockton,California <br /> Boring Cement <br /> Elevation Borehole Casing Screened Filter Pack <br /> Well I.D. Construction (TOC feet Depth Diameter Diameter Casing Slot Size Interval(feet Interval(feet Bentonite Seal Seal Comments <br /> Date MSL) ((fest (inches) (inches) Material (inches) bgs) bgs) Interval(feet bgs) Interval <br /> feet bgs] <br /> om or n e s <br /> E-1 5/24/84 - 24.5 3 PVC 8-23 5-32 1-5 0-1 Destroyed June 1994 <br /> E-2 5/24/84 3.92 21.5 3 PVC 6-21 5-21 1-5 0-1 <br /> E-3 5/24/84 3.34 25 4 PVC 17-24 5-24 1-5 0-1 <br /> E-4 5/24/84 3.32 29.5 3 PVC 5-22 5-22 1-5 0-1 <br /> E-5 5/24/84 3.49 21 3 PVC 5-22 3-21 1-3 0-1 <br /> E-6 5/24/84 2.77 19.5 3 PVC 4.5-19.5 4-19.5 1-4 0-1 <br /> E-7 5/30/84 2.27 20 3 PVC 5-20 4-20 0-4 0-0 <br /> E-8 5/30/84 2.01 30.5 3 PVC 4-24 4-24 0-4 0-0 <br /> E-9 5/30/84 2.60 22.5 3 PVC 5-19.5 4-19 0.4 0-0 <br /> E-10 5/30/84 2.01 25.25 3 PVC 8-25 7-25 0-7 0-0 <br /> E-11 5/30/84 4.46 24 3 PVC 4-24 3-24 0-3 0-0 <br /> E-12 5/30/84 2.99 30 3 PVC - 6-23 5-23 0-5 0-0 <br /> BHD-1 1/21/88 1.24 31.5 4 PVC 0.020 8-28 6-28 1-6 0-1 <br /> BHD-2 1/22/88 1.93 31.5 4 PVC 0.020 8-28 6-28 1-6 0-1 <br /> PR-1 1/19/88 1.87 31.5 4 PVC 0.020 8-28 6-28 1-6 0-1 <br /> PR-2 1/19/88 1.72 31.5 4 PVC 0.020 8-28 6-28 1-6 0-1 <br /> MW-1 10/11/93 2.31 30 10 4 PVC 0.020 10-30 8-30 5-8 0-5 <br /> MW-2 10/19/93 2.16 28.5 10 4 PVC 0.020 8.5-28.5 6-28.5 3.5-6 0-3.5 <br /> MW-3 12/21/94 3.33 30 10 2 PVC 0.020 9.5-29.5 - - - <br /> MW-4 12/21/94 3.58 30 10 2 PVC 0.020 8.5-28.5 Destroyed June 2007 <br /> MW-5 12/22/94 2.01 30 10 2 PVC 0.020 10-30 <br /> Remediat on Wells <br /> r <br /> R-1 7/24/84 - 42 - 12 PVC - 9-35 8-40 - - <br /> V-1 10/13/93 1.94 24 10 4 PVC 0.030 4-24 3-24 2-3 0-2 <br /> V-2 10/12/93 1.47 25 10 4 PVC 0.030 4-24 3-25 2-3 0-2 <br /> V-3 10/12/93 1.56 25 10 4 PVC 0.030 4-24 3-25 2-3 0-2 <br /> V-4 10/14/93 2.24 25 10 4 PVC 0.030 4-24 3-24 2-3 0-2 <br /> V-5 10/18/93 3.26 25 10 4 PVC 0.030 4.5-24.5 3-25 2-3 0-2 <br /> V-6 10/14/93 2.34 23 10 4 PVC 0.030 3-23 2-23 1-2 0-1 <br /> V-7 10/15/93 2.16 25 10 4 PVC 0.030 4-24 3-24 2-3 0-2 <br /> V-8 8/15/94 21.5 10 2 PVC 0.030 6-21 5-21 3-5 0-3 <br /> V-9/S-7 8/15/94 31.5 - 1 PVC 0.020 6-21/27.5-30 5-21/26.5-30 3-5/21-26.5 0-3 <br /> V-10/S-8 8/16/94 31.5 - 2/1 PVC 0.020 6-21/27.5-30 5-21/26.5-30 3-5/21-26.5 0-3 <br /> V-11 8/15/94 2.95 21.5 10 2 PVC 0.030 5-21 4-21 2-4 0-2 <br /> V-12 8/16/94 1.21 21.5 - 2 PVC - 6-21 5-21 3-5 0-3 <br /> S-1 10/12/93 0.90 25 1 PVC Sch.40 0.020 22-24 19-25 14-19 0-14 <br /> S-2 10/13/93 1.75 25 1 PVC Sch.40 0.020 23-25 20-25 15-20 0-15 <br /> S-3 10/15/93 2.30 25 1 PVC Sch.40 0.020 23-25 19-25 12-19 0-12 <br /> S-4 10/15/93 1.39 24.5 6 1 PVC Sch.40 0.020 22-24 18.5-24 15.5-18.5 0-15.5 <br /> S-5 10/18/93 2.58 24.5 6 1 PVC Sch.40 0.020 20-22 19-24 15-19 0-15 <br /> S-6 10/19/93 4.25 25 - 1 PVC Sch.40 0.020 23-25 20-25 16-20 0-16 <br /> S-9 8/16/94 1.73 30 1 PVC Sch.40 0.020 27.5-30 26.5-30 21-26.5 0-21 <br /> I <br /> i <br /> Well Construction Details.xls 1 oft SECOR <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.