My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 12:07:10 PM
Creation date
2/7/2019 10:31:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> Well Construction Details <br /> ARCO Service Station No.2133 and Chevron Service Station No.9-4275 <br /> 2908 2905 West Benjamin Holt Drive <br /> Stockton,California <br /> Boring Cement <br /> Elevation Borehole Casing Screened Filter Pack <br /> Well I.D. Constructlon (TOC feet Depth Diameter Diameter Casing Slot Size Interval(feet Interval(feat Bentonite Seal Seal Comments <br /> Date MSL) (feet (Inches) (Inches) Material (inches) bgs) bgs) Interval(feet bgs) Interval <br /> b g feet bgs <br /> HVON <br /> Monitoring Wells <br /> MW-1 2/28/89 36.5 11 4 PVC 0.020 8-32 6-32 5-6,32-36.5 0-5 Destroyed May 2005 <br /> MW-2 2/27/89 34 11 4 PVC 0.020 17-31.5 15-31.5 13.5-15,31.5-34 0-13.5 Destroyed May 2005 <br /> MW-3 2/28/89 31.5 11 4 PVC 0.020 17-28 15.5-28 14.5-15.5,28-31.5 0-14.5 Destroyed May 2005 <br /> MW-4 3/1-3/2/1989 33.5 11 4 PVC 0.020 16-30 15-30 14-15,30-33.5 0-14 Destroyed May 2005 <br /> MW-5 3/1/89 28.5 11 4 PVC 0.020 8-28 7-28 6-7,28-28.5 0-6 Destroyed May 2005 <br /> MW-6 3/3/92 2.50 31.5 8 2 PVC 0.020 10-30 8-31.5 6-8 0-6 <br /> MW-7 3/3/92 - 31.5 8 2 PVC 0.020 10-30 8-31.5 6-8 0-6 Destroyed May 2005 <br /> MW-8 12/13/93 2.26 31.5 8 2 PVC 0.020 10-30 9-31.5 7-9 0-7 <br /> MW-9 6/20/94 - 31.5 8 2 PVC 0.020 10-30 8-31.5 6-8 0-6 Destroyed May 2005 <br /> MWAR 3/1/06 3.47 60 6 2 PVC 0.010 5-20 4-23 3-4,23-25 0-3,25-60 <br /> MW-2R 2/27/06 4.07 65 6 2 PVC 0.010 5-20 4-23 3-4,23-25 0-3,25-65 <br /> MW-3R 2/28/06 4.02 59 6 2 PVC 0.010 5-20 4-23 3-4,23-25 0-3,25-65 <br /> MW-5R 6/5/06 4.49 20 4.25 2 PVC - 5-20 4-20 2-4 0-2 <br /> MW-7R 6/5/06 4.13 20 4.25 2 PVC 5-20 4-20 2-4 0-2 <br /> MW-9R 6/5/06 2.76 20 4.25 2 PVC 5-20 4-20 2-4 0-2 <br /> MW-10 6/11/07 2.95 20 4.25 2 PVC 0.020 5-20 4-20 2-4 0-2 <br /> Remediation Wells <br /> GM-1 11/13/96 28 10 2 PVC 0.020 9-17,25-28 9-18,24.5-28 8.5-9,18-24.5 0-8.5 Destroyed May 2005 <br /> GM-2 11/14/96 28 10 2 PVC 0.020 10-17,26-28 9.5-18,25-28 9-9.5,18-25 0-9 Destroyed May 2005 <br /> GM-3 11/18/96 28 10 2 PVC 0.020 10-17,26-28 9-18,25-28 8.5-9,18-25 0-8.5 Destroyed May 2005 <br /> GM-4 11/14/96 28.5 10 2 PVC 0.020 10-17,26-28.5 9-18,25-28.5 8.5-9,18-25 0-8.5 Destroyed May 2005 <br /> GM-5 1/24/97 30 10 2 PVC 0.020 10-17,27-30 9.5-18,26-30 8.5-9.5,18-26 0-8.5 Destroyed May 2005 <br /> GM-6 11/18/96 28.5 10 2 PVC 0.020 10-17,26-28.5 8.5-9.5 8.5-9.5,25.5-28.5 0-8.5 Destroyed May 2005 <br /> GM-7 11/15/96 30 10 2 PVC 0.020 10-17,28-30 9-18,27-30 8.5-9,18-27 0-8.5 Destroyed May 2005 <br /> GM-8 11/15/96 29 10 2 PVC 0.020 10-17,27-29 9-18,26-29 8-9,18-26 0-8 Destroyed May 2005 <br /> GM-9 1/24/97 29.5 10 2 PVC 0.020 10-17,26-29.5 9-18,25.5-29.5 8.5-9,18-25.5 0-8.5 Destroyed May 2005 <br /> VW-1 3/3/92 20 8 2 PVC - 12.5-17.5 10-20 8-10 0-8 Destroyed May 2005 <br /> R-1 10/1/88 - - - PVC 848 - - Destroyed <br /> AS-8 2/23/06 65 6 PVC - 0-65 <br /> AS-9 2/24/06 67.5 6 PVC 0-65 <br /> AS-10 2/27/06 63 6 PVC 0-63 <br /> AS-11 312/06 25 6 PVC 0-25 <br /> Soil ori gs <br /> SBA 6/20/94 21.5 8 0 21.5 <br /> SB-2 6/20/94 21.5 6 0-21.5 <br /> SB-3 6/20/94 18.5 6 0-18.5 <br /> SB-4 6/20/94 18.5 6 0-18.5 <br /> Notes: <br /> bgs=below ground surface <br /> TOC=top of casing <br /> PVC=polyvinyl chloride <br /> MSL=mean sea level <br /> Sch.=Schedule <br /> Filter Pack is with#3 sand <br /> -=Not Available/Not Applicable <br /> Well Construction Details.xls 2 of 2 SECOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.