Laserfiche WebLink
Work Plan for Additional Assessment <br /> S . ECOR <br /> ARCO Service Station No.2133 and Chevron Service Station No.9-4275 <br /> Stockton,California <br /> Page 5 <br /> LIMITATIONS <br /> This report was prepared in accordance with the scope of work outlined in SECOR's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of Atlantic Richfield Company Atlantic Richfield Company, a BP <br /> affiliated company, for the express purpose stated above. Any re-use of this report for a <br /> different purpose or by others not identified above shall be at the user's sole risk without liability <br /> to SECOR. To the extent that this report is based on information provided to SECOR by third <br /> parties, SECOR may have made efforts to verify this third party information, but SECOR cannot <br /> guarantee the completeness or accuracy of this information. The opinions expressed and data <br /> collected are based on the conditions of the site existing at the time of the field investigation. <br /> No other warranties, expressed or implied are made by SECOR. <br /> Prepared by: Reviewed by: <br /> Michael Sperber Kristin Shelton <br /> Project Geologist Associate Engineer <br /> All information, conclusions, and recommendations provided by SECOR in this document <br /> regarding the site been prepared under the supervision of and reviewed by the Licensed <br /> professional whose signature appears below. <br /> Licensed Approver: OQ�ypFESS/04� <br /> E.BECO <br /> a c <br /> m <br /> Rusty Ben osk � 58 9 X <br /> Principal Eng' er EXP.12/31/2008 <br /> May 22, 2007 CIVIL <br /> �TFOF CAUL <br />