Laserfiche WebLink
i <br /> Work Plan for Additional Assessment S E C O R <br /> ARCO Service Station No.2133 and Chevron Service Station No.9-4275 <br /> Stockton,California <br /> Page 6 <br /> Addendums: <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan with Proposed Well Locations <br /> Figure 3 Detailed Site Plan Chevron Station 9-4275 <br /> Figure 4 Detailed Site Plan ARCO Station 2133 <br /> Table 1 Well Construction Table <br /> Table 2 Historical Groundwater Monitoring and Analytical Data (ARCO) <br /> Table 3 Historical Groundwater Monitoring and Analytical Data (Chevron) <br /> Attachment A Access Agreements <br /> Attachment B Standard Procedure for Hollow Stem Auger Drilling <br /> Attachment C Well Permit Applications <br /> cc: Ms. Stephanie Furgal, Chevron Environmental Management Company, San Ramon, <br /> California (upload to STRATA) <br /> Mr. Don Pratt, Atlantic Richfield Company (upload to ENFOS) <br /> Mr. Marcus Pierce, California Regional Water Quality Control Board — Central Valley <br /> Region, Sacramento, California <br /> Mr. Eric Holm, Delta Environmental Consultants, Inc., Rancho Cordova, California <br /> Upload to Geotracker <br /> REFERENCES <br /> URS, 2004. Revised Site Conceptual Mode Report, ARCO Service Station No. 2133 and <br /> Chevron Service Station No. 9-4275. 5 January. <br />