My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
INSTALL 1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:39:31 AM
Creation date
2/7/2019 2:15:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1990
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O DEPTH OF EXCAVATION EXCAVATION SIZE <br /> U <br /> The hole must be deep enough to provide sufficient Stable Soil Conditions <br /> bedding and cover depth as determined by the type of <br /> Jsurface pavement and loading. NFPA 30 and 31 should Where shoring is not required to maintain a vertical wall <br /> J1Wbe consulted as well as local codes. from top to bottom of the excavation, the minimum <br /> spacing between the sidewall or endcap of the tank and <br /> Tanks subjected to - _=_ - ZI side of excavation must be 24 inches (61 cm). <br /> traffic loads must have 6" <br /> a cover depth of at N I� H--p 6„ If more than one tank is to be installed in the same hole, <br /> least 30 inches (76cm) <br /> there must be at least 24 inches (61 cm) between the <br /> !I �if � <br /> of backfill plus 6 inches tanks. <br /> - <br /> (15cm) of asphalt. An _ 1 <br /> acceptable alternativeTRAFFIC III <br /> u <br /> is a minimum of 18 30 _ DRY <br /> CONDITIONS Stable <br /> inches (46cm) of 12" Soil <br /> backfill plus 6 inches -� �_ �I� <br /> (15cm) of steel re-bar S - <br /> reinforced concrete. <br /> Tanks subjected to = <br /> traffic loads and high ---- <br /> water must have a 8„ 6 24"� 24 <br /> minimum of 30 inches24 =11' _ <br /> C"F <br /> (76cm) of backfill and °IIII-I II��"II <br /> either 8 inches (20cm) =1 _ FIT, _ =-'r -fILI,=I = <br /> of asphalt or 6 inches - <br /> p 30" <br /> (15cm) of steel re-bar 30���� TRAFFIC <br /> CONDITIONS ` <br /> reinforced concrete. ] 12„ <br /> '" Unstable Soil Conditions <br /> If the soil has less than 750 lbs/sq. ft. cohesion as cal- <br /> culated from an unconfined compression test;or in soils <br /> Tanks not subjected to having an ultimate bearing capacity of less than 3500 <br /> traffic loads must have lbs/sq. ft.; or where soil will not maintain a vertical wall, <br /> a minimum cover 24" the excavation must allow a minimum space equal to 1/2 <br /> depth of 24 inches 4 12" the diameter of the tank between the side and endcap <br /> (61 cm)of backfill,or 12I - �- of the tank and the excavation wall. The spacing be- <br /> inches (30cm) backfill -- fi tween adjacent tanks, 24 inches (61 cm), remains the <br /> plus 4 inches (10cm) _ DRY - same. <br /> of steel re-bar rein- - coNNioloNs p <br /> forced concrete. - - TRAFFICf'I'� <br /> Unstable <br /> 1.„I � ; , '/z Soil I <br /> -' 12' Tank <br /> �I;II Dia. <br /> Tanks in high water <br /> areas not subjected to <br /> traffic loads must have _ <br /> a minimum of 36 - 1- <br /> inches (91 cm) of 36" '/z Tank _}I 24" <br /> backfill covering. Dia. t - <br /> WET - D', ilk - <br /> ,_' 1 7m 3nCONDITIONS -' rNO - <br /> TRAFFIC 12" <br /> NOTE: MANWAY RISER MUST NOT REST ON THE TANK. There <br /> must be a minimum six-inch space between the bottom of the riser <br /> and top of the tank. <br /> NOTE: These depths of cover are MINIMUMS for high water areas <br /> without traffic over the tank. <br /> NOTE:Asphalt and concrete pads must extend a minimum of 12 inches <br /> (30cm)beyond tank in all directions. <br /> NOTE: Maximum burial depth is 7 feet(2.1 meters)of cover over top <br /> of tanks. <br />
The URL can be used to link to this page
Your browser does not support the video tag.