Laserfiche WebLink
60 HILLSIDE INSTALLATION CAUTION: DO NOT ,IFRIKE THE TANK <br /> Tanks may be installed on moderately sloping terrain <br /> WITH STEEL BAR <br /> ended <br /> provided the slope does not exceed 10 gl dirt isTnot he hatrwaterflorsprodugcttbetop added as ballastof tank,it isountil piping <br /> downhill side must consist of native sol Fil <br /> permitted on this side to alter the grade <br /> ow the suorface of the ng wf the slope. and ith product, make sureaccomplish <br /> tank ade- <br /> The top of the tank ming to grade is <br /> ust be <br /> downhill side, and must be covered by material with CAUTIONquately -Do Do not ballast tank with water or product <br /> depths as stated in item 4. <br /> until backfill is even with top of tank (except as noted in <br /> wet hole procedure). <br /> The same material as specified in Item 3 must be used <br /> to completely fill excavation. The backfill must be free <br /> of debris.Any blocks or bricks used as support material <br /> I - during piping must be removed prior to completion of <br /> backfilling. Safety measures, such as placing barri- <br /> III cades until installation is complete, should be used <br /> I II <br /> Ill- around the excavation site. <br /> III=1111 ,III- -_ <br /> 1111 II _ NOTE:If there is any reason to believe that water might enter the hole <br /> I II IIII II = _ after installation,or if hole is in clay soil with poor drainage,anchoring <br /> I is required. <br /> I I=1111 l <br /> III 12 O WET HOLE INSTALLATION <br /> III (II III = 1 = 1 1111_ 1 = I <br /> Pump the water from the hole to maintain minimum wa- <br /> I ter level.Add a minimum of 12 inches(30cm)of backfill <br /> 7 DRY HOLE INSTALLATION material to the hole, and level the bed to assure com- <br /> plete bottom support for the tank. Position the tank in <br /> The bed must be smooth and level, and must contain a the hole.The 24 inch(61 cm)spacing between tank and <br /> minimum of 12 inches (30cm) of smooth and level pea side wall must be maintained as a minimum in a wet <br /> gravel or stone crushings. (See (1) Place the tank or hole installation. <br /> tanks on the bed carefully. Do not install Xerxes Century- Partially fill the tank with water until it settles firmly on : <br /> Cast Tanks directly on a concrete slab, or grout tanks in the prepared bed. Ballast level in a tank must never <br /> wet concrete. Also, do not install these tanks on tim- exceed water level in hole during installation. Use only <br /> bers, beams, cradles or directly on the hole bottom. enough water to ballast the tank until backfill material is <br /> Leveling even with the top of the tank. - <br /> After the tank is bedded, and prior to backfilling, it must Never fill the second- <br /> be leveled. For longitudinal leveling,place the level across clary (external) tank <br /> the tank at the top surface. Lateral leveling is accom- with a fluid. <br /> plished by placing the level across the top of the tank After leveling tanks, <br /> outlet or manway the anchoring proce- <br /> dures in Item 9 must <br /> Backfilling - <br /> be followed. _ <br /> Backfill uniformly with the same material used for bed <br /> ding. In freezing conditions make sure the material is Backfill must be added - <br /> dry and free of ice and snow. First,place a 12 inch(30cm) evenly after anchor- <br /> ... <br /> lift of backfill evenly around the tank. Work the material ing, and remaining dry 12 <br /> completely beneath the tank body and endcaps by hand hole backfilling pro- <br /> in order to provide full support. A board or tamping bar cedures should be <br /> should be used to followed as stated in <br /> force the material in WRONG Item 7. <br /> place. After the first °go <br /> 18-24 inches(46-61 �. NOTE:Cover depth must meet minimum depth specified in Item 4 of <br /> i <br /> these installation instructions. <br /> cm) of backfill isn <br /> place, use the ° NOTE:It is recommended the tank be ballasted with water or product <br /> tamping bar to work = _ _ _ _ once backfill is even with the top of the tank. <br /> the backfill into the NOTE: Never allow an empty tank to remain in a wet hole or a dry <br /> voids under the hole that may become wet for any period of time without deadmen <br /> edges of the tank <br /> RIGHT ° and backfill completed. <br /> and around the <br /> endcaps. Remain- <br /> der of backfill can <br /> now be done with- <br /> out further hand <br /> work. <br />