Laserfiche WebLink
Mr Kyle Chnstie <br /> December 6, 1994 <br /> Page 2 <br /> experienced underground locator service will be used to locate utilities at the site Dunne, <br /> drilling, soil samples will be collected every tive feet from each borehole for lithologic <br /> identification and possible laboratory analysis Two or three soil samples from each borehole <br /> will be analyzed for total petroleum hydrocarbons as gasoline (TPH-G) and benzene, <br /> ethylbenzene, toluene, and xylenes (BTEX) Upon completion of the wells, they will be <br /> developed and sampled as described in Attachment B A site safety and health plan (SSHP) <br /> has been prepared by Brown and Caldwell (BC) for use during environmental fieldwork at <br /> Northern California ARCO facilities A copy of the SSHP will be on-site and implemented <br /> during the fieldwork described in this work plan <br /> Written otf-site access permission has been obtained from the Village Green Owners <br /> Association (property to the south of the ARCO facility) BC has submitted an encroachment <br /> permit application and fees to Cal-Trans for access to the Cal-Trans right-of-way to the west <br /> of the ARCO facility Copies of the access documentation is included with this work plan <br /> as Attachment C <br /> It you have any questions regarding this work plan, please contact me at (916) 444-0123. <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> _ e <br /> Steve Misner 4Javy?ucas <br /> Project Manager California Registered Geologist#4301 <br /> SDM-JL ksc <br /> Enclosures <br /> cc- Ms Diane Hinson San Joaquin County <br /> Ms. Elizabeth Thayer, California Regional Water Quality Control Board, <br /> Central Valley Region <br /> • <br /> 12101AWUMISOMAEPORTMGROUND WP <br /> QNS•PS 10 <br />