My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000469
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:13:29 PM
Creation date
2/7/2019 2:24:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000469
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
View images
View plain text
1 <br /> B R O W N A N' D s�s�4i <br /> C A L D W E L L <br /> �o <br /> February 24, 1995 <br /> Mr David Kemena O 5 <br /> Air Quality Specialist <br /> San Joaquin Valley Unified Air <br /> Pollution Control District <br /> 4230 Kiernan Avenue, Suite 130 <br /> Modesto, California 95356 017-1885-01/1 <br /> Subject Source Test Results, Authority to Construct Permit Number N-78-3-0, <br /> ARCO Facility 2133, Stockton, California <br /> Dear Mr Kemena <br /> On behalf of ARCO Products Company (ARCO), Brown and Caldwell (BC) is providing the <br /> results from compliance source testing performed by BC on the AIREX KATOX 100 <br /> Catalytic Oxidizer (oxidizer) located at ARCO Facility 2133, 2908 Benjamin Holt Drive, <br /> Stockton, California This work was completed under San Joaquin Valley Unified Air <br /> Pollution Control District (SJVUAPCD) Authority to Construct permit number N-78-3-0 and <br /> the Source Test Plan, dated November 1, 1994, written by BC and submitted to the <br /> SJVUAPCD <br /> Schedule of Events <br /> Four compliance source tests were performed on the soil vapor extraction and treatment <br /> system oxidizer at ARCO Facility 2133 The test dates were November 23, 1994, December 5 <br /> and 6, 1994, and January 11, I995 <br /> The oxidizer was initially started by the manufacturer on November 21, 1994, and was left <br /> running until completion of the November 23, 1994, source test observed by you Following <br /> collection of air samples on November 23, 1994, the system was turned off <br /> Results from laboratory analysis of air samples collected on November 23, 1994, revealed <br /> destruction removal efficiencies (DRE) of only 82 4 percent for total petroleum hydrocarbons <br /> as gasoline (TPH-G) and 95 6 percent for benzene based on inlet concentrations of 680 parts <br /> per million by volume (ppmv) TPH-G and 7 5 ppmv benzene The DRE for TPH-G was <br /> below the SJVUAPCD permit condition of 95 percent as stated in the Authority to Construct <br /> permit number N-78-3-0 <br /> 02/24/9"\IBSS\CORRFSP�I98501 L <br /> crnrpnmental Ergrneerrng AnC Constil,rng ArafyticalSerwces <br /> QHS PSR60 <br /> 9616 %11CRON A% E�LE SLITE 600 S \CR >\IE%TO C �, 9 527 2627 <br /> f916) 444 012 + F9 16) 8)6 )2 7 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).